WELL · 42-295-32175 · DISTRICT 10

Eleven Bar #1

Y

Lipscomb County · Second Creek (Morrow Upper) field · Temp Abandoned  · Vertical

Eleven Bar #1 (API 42-295-32175) is a well in Lipscomb County operated by Bce-Mach II LLC, completed March 27, 1994 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 11, 1994, permitted to 9,700 ft.

It was permitted by Medallion Production Company and has since transferred to Bce-Mach II LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Brown Dolomite, Douglas, Tonkawa, Marmaton.

No lease production has been reported under this well’s leases.

Operator of record

Bce-Mach II LLC

Permitted by Medallion Production Company; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Jun 4, 2026 · (833) 831-2164

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBce-Mach II LLC
Production reportsPetrohawk Operating Companythrough Feb 2009
Latest permitMedallion Production CompanyFeb 11, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
2
permits on file
Feb 11, 1994
last permit issued
Mar 27, 1994
completed
0
cumulative oil, bbl
1.13M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 27, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Eleven Bar G-14-149600Second Creek (Morrow Upper)Bce-Mach II LLC101.13MMar 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Medallion Production CompanyApr 1994 → Aug 1996
  2. 2Intercoast Oil and Gas CompanySep 1996 → Mar 1997
  3. 3KCS Medallion Resources, Inc.Apr 1997 → Dec 2001
  4. 4KCS Resources, Inc.Jan 2002 → May 2002
  5. 5Wynn-Crosby Energy, Inc.Jun 2002 → May 2005
  6. 6Petrohawk Operating CompanyJun 2005 → Feb 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
421076-98DrillMedallion Production CompanyApr 28, 1994Feb 11, 1994—9,700
421076-99DrillMedallion Production CompanyFeb 11, 1994Feb 11, 1994Feb 16, 19949,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-149600————

Formation tops

As filed on W-2/G-1. Subsea from 2,620 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,345-725
DouglasDOUGLAS SAND5,802-3,182
TonkawaTONKAWA SAND6,350-3,730
Marmaton7,667-5,047
MorrowUPPER MORROW8,696-6,076
MorrowMIDDLE MORROW9,112-6,492

Perforations

Perforated and open-hole intervals.

FromToType
8,6988,706Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,11012.25655 S
4.59,4508.75400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 7, 1994Apr 29, 1994Yes
00Jun 23, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29532175, documented in the API reference.