WELL · 42-295-32301 · DISTRICT 10
Laurie J.M. A #4725
Lipscomb County · Bradford (Cleveland) field · Horizontal
Laurie J.M. A #4725 (API 42-295-32301) is a horizontal well in Lipscomb County operated by BP America Production Company, completed September 23, 1996.
The RRC has issued 3 drilling permits (amended once) between 1996 and 2007, permitted to 10,200 ft.
Completion filings report 13 formation tops, including Bd, Doug, Tonk, Tonkawa.
No lease production has been reported under this well’s leases.
Operator of record
Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BP America Production Company |
| Production reports | BP America Production Companythrough May 2005 |
| Latest permit | BP America Production CompanyOct 25, 2007 |
- 10,200
- total depth, ft
- 4
- permits on file
- Oct 25, 2007
- last permit issued
- Sep 23, 1996
- completed
- 0
- cumulative oil, bbl
- 288K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 23, 1996
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Laurie, J. M. "A" G-14-238902 | Bradford (Tonkawa) | Complete Oil & Gas Services, LLC | 1 | 0 | 0 | Aug 2007 – Jul 2026 |
| Laurie, J.M. "A" G-14-161236 | Bradford (Cleveland) | BP America Production Company | 1 | 0 | 288K | Sep 1996 – Aug 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Midgard Energy CompanySep 1996 → Sep 1997
- 2Crescendo Resources, L.P.Oct 1997 → Mar 2000
- 3Amoco Production CompanyApr 2000 → Dec 2001
- 4BP America Production CompanyJan 2002 → May 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 647990-99 | Recompletion | BP America Production Company | Oct 17, 2007 | Oct 25, 2007 | Jul 20, 2007 | 10,200 |
| 600881-98 | Recompletion | BP America Production Company | Jun 10, 2005 | Jun 13, 2005 | May 17, 2005 | 8,500 |
| 600881-99 | Recompletion | BP America Production Company | May 18, 2005 | Jun 13, 2005 | — | 8,500 |
| 448110-99 | Drill | Midgard Energy Company | May 14, 1996 | Jun 13, 1996 | Jul 17, 1996 | 10,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-161236 | — | — | — | — |
| — | — G-14-238902 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,557 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BD | 3,426 | -869 |
| Doug | 5,946 | -3,389 |
| Tonk | 6,544 | -3,987 |
| Tonkawa | 6,561 | -4,004 |
| KC | 6,972 | -4,415 |
| Cleveland | 7,392 | -4,835 |
| Cleve Pay | 7,560 | -5,003 |
| Cleveland | 7,562 | -5,005 |
| Des Moines | 8,056 | -5,499 |
| Atoka | 8,850 | -6,293 |
| NW | 9,041 | -6,484 |
| SQ B | 9,631 | -7,074 |
| MorrowLOWER MORROW | 9,876 | -7,319 |
| MississippianMISS | 10,075 | -7,518 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,561 | 6,580 | Perforated |
| 7,356 | 7,445 | Perforated |
| 7,562 | 7,572 | Perforated |
| 7,576 | 7,616 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,796 | 12.25 | 1,405 S |
| 8.625 | 1,796 | — | — |
| 4.5 | 10,190 | 7.875 | 315 S |
| 4.5 | 10,194 | — | — |
| 4.5 | — | — | 595 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 28, 2009 | Mar 13, 2006 | Yes |
| 00 | Oct 2, 2008 | Oct 29, 2007 | Yes |
| 00 | Sep 15, 2008 | — | — |
| 00 | Feb 12, 1997 | Oct 25, 1996 | Yes |
| 00 | Jan 31, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-295-32301 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-295-32301 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29532301, documented in the API reference.