WELL · 42-295-32377 · DISTRICT 10
Piper #2689
Lipscomb County · Bradford (Cleveland) field · Vertical
Piper #2689 (API 42-295-32377) is a plugged well in Lipscomb County, plugged January 13, 2004, last operated by BP America Production Company.
The RRC has issued one drilling permit, issued June 23, 1997, permitted to 7,900 ft.
It was permitted by Midgard Energy Company and has since transferred to BP America Production Company on the wellbore schedule.
Completion filings report 5 formation tops, including Bd, Dgls, Tonk, Kc.
Its lease has reported 669 barrels of oil and 7.12K mcf of gas since September 1997, last reporting in June 2004.
Operator of record
Permitted by Midgard Energy Company; the EWA schedule now lists a different operator.
Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BP America Production Company |
| Production reports | Crescendo Resources, L.P.through May 1999 |
| Latest permit | Midgard Energy CompanyJun 23, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,900
- total depth, ft
- 1
- permits on file
- Jun 23, 1997
- last permit issued
- Sep 15, 1997
- completed
- 669
- cumulative oil, bbl
- 7.12K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jun 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 1997
- Shut in
- —
- Plugged
- Jan 13, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Piper O-14-7256 | Bradford (Cleveland) | BP America Production Company | 1 | 669 | 7.12K | Sep 1997 – Jun 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Crescendo Resources, L.P.Oct 1997 → May 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 463852-99 | Drill | Midgard Energy Company | Jun 16, 1997 | Jun 23, 1997 | Aug 16, 1997 | 7,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-7256 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,480 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BD | 3,418 | -938 |
| Dgls | 6,031 | -3,551 |
| Tonk | 6,580 | -4,100 |
| KC | 7,026 | -4,546 |
| Clev Pay | 7,671 | -5,191 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,680 | 7,708 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,010 | 12.25 | 1,070 S |
| 4.5 | 7,881 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 24, 1998 | Mar 27, 1998 | Yes |
| 00 | Apr 15, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-295-32377 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-295-32377 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29532377, documented in the API reference.