WELL · 42-295-32885 · DISTRICT 10

Piper Ola O. #24

N

Lipscomb County · Bradford (Cleveland) field  · Horizontal

Piper Ola O. #24 (API 42-295-32885) is a horizontal well in Lipscomb County operated by BP America Production Company, completed October 21, 2005.

The RRC has issued one drilling permit (amended once), issued June 8, 2005, permitted to 8,500 ft.

Completion filings report 4 formation tops, including Cottage Grove, Hogshooter, Kc Lime, Cleveland.

Its 2 leases have reported 35.2K barrels of oil and 1.62M mcf of gas since June 1998, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

BP America Production Company

Denver, CO · P-5 Y, filed May 4, 2026 · 1,623 permits on file · (720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBP America Production Company
Production reportsLatigo Petroleum, LLCthrough Mar 2026
Latest permitBP America Production CompanyJun 8, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
Jun 8, 2005
last permit issued
Oct 21, 2005
completed
35.2K
cumulative oil, bbl
1.62M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 21, 2005
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Piper, Ola, O. O-14-8289Lipscomb (Cleveland)Latigo Petroleum, LLC311.9K650KMay 2011 – Jul 2026
Piper, Ola, O. O-14-7279Bradford (Cleveland)BP America Production Company423.3K971KJun 1998 – Sep 2014

Gas, mcf lease total

Last 12 months 29,519 · prior 12 29,903(-1%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 779 · prior 12 592(+32%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crescendo Resources, L.P.Jun 1998 → Mar 2000
  2. 2Amoco Production CompanyApr 2000 → Dec 2001
  3. 3BP America Production CompanyJan 2002 → Jan 2020
  4. 4Latigo Petroleum, LLCApr 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
600681-98DrillBP America Production CompanySep 8, 2009Jun 8, 2005Jul 31, 20058,500
600681-99DrillBP America Production CompanyMay 16, 2005Jun 8, 2005Jul 31, 20058,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-7279————
—— O-14-8289————

Formation tops

As filed on W-2/G-1. Subsea from 2,532 ft elevation.Download CSV →

FormationMD ftSubsea
Cottage Grove7,144-4,612
Hogshooter7,427-4,895
KC Lime7,478-4,946
Cleveland7,528-4,996
ClevelandCLEVELAND SAND7,776-5,244

Perforations

Perforated and open-hole intervals.

FromToType
7,0538,217Perforated
7,9288,248Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,32212.25920 S
4.58,2488.75400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 2011Nov 30, 2009—
00Mar 8, 2010Nov 30, 2009—
00Oct 28, 2009May 27, 2008Yes
00Sep 17, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29532885, documented in the API reference.