WELL · 42-297-31666 · DISTRICT 2

Herring -A- #1

Plugged

Live Oak County · Clayton (Wilcox 7720) field  · Vertical

Herring -A- #1 (API 42-297-31666) is a plugged well in Live Oak County, plugged June 23, 1988, last operated by Kilroy Company Of Texas Inc..

The RRC has issued 3 drilling permits between 1977 and 1985, permitted to 8,500 ft.

Completion filings report 2 formation tops, including Massive, Wilcox.

Operator of record

Kilroy Company of Texas Inc.

Houston, TX · P-5 Inactive, filed Apr 26, 1991 · 235 permits on file · (713) 651-0101

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKilroy Company of Texas Inc.
Production reportsnone
Latest permitKilroy Company of Texas, Inc.Mar 6, 1985
8,500
total depth, ft
3
permits on file
Mar 6, 1985
last permit issued
Feb 23, 1978
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 23, 1978
Shut in
—
Plugged
Jun 23, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
268868-99RecompletionKilroy Company of Texas, Inc.Jun 19, 1985Mar 6, 1985—6,445
115184-99RecompletionKilroy Company of Texas, Inc.Apr 14, 1981Apr 14, 1981—7,000
13740-99DrillKilroy Company of Texas, Inc.Dec 9, 1977Dec 9, 1977—8,500

Formation tops

As filed on W-2/G-1. Subsea from 293 ft elevation.Download CSV →

FormationMD ftSubsea
Massive6,992-6,699
Wilcox7,756-7,463

Perforations

Perforated and open-hole intervals.

FromToType
6,4216,426Perforated
6,8966,900Perforated
6,9927,000Perforated
7,7567,770Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,578—655 S
2.3756,823——
2.3757,125——
5.58,496—75 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 5, 1985Apr 26, 1985—
00Jul 20, 1985——
00Jan 12, 1984Apr 17, 1981—
00Jan 12, 1984Mar 27, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29731666, documented in the API reference.