WELL · 42-297-31852 · DISTRICT 2

EL Paso Natural Gas #1

N

Live Oak County · Chapa East (9800) field  · Vertical

El Paso Natural Gas #1 (API 42-297-31852) is a well in Live Oak County operated by Phillips Petroleum Company, completed January 24, 1979.

The RRC has issued 2 drilling permits between 1978 and 1991, permitted to 11,500 ft.

Completion filings report 4 formation tops, including Pettus, Sparta, Queen City, Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Phillips Petroleum Company

Houston, TX · P-5 Y, filed Jun 20, 2003 · 2,544 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePhillips Petroleum Company
Production reportsTidewater Minerals Corporationthrough Feb 2013
Latest permitPhillips Petroleum CompanyDec 16, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
2
permits on file
Dec 16, 1991
last permit issued
Jan 24, 1979
completed
0
cumulative oil, bbl
2.22M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 24, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
EL Paso Natural Gas G-2-140659Chapa, East (9500)A + Investments a Texas LLC102.22MJan 1993 – Jul 2026
— G-2-82787——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Mar 2007
  3. 3Quantum Resources Management,llcApr 2007 → Dec 2008
  4. 4Tidewater Minerals CorporationSep 2009 → Feb 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
395130-99RecompletionPhillips Petroleum CompanyDec 16, 1991Dec 16, 1991Dec 10, 19919,775
34663-99DrillAminoil USA Inc.Oct 16, 1978Oct 16, 1978—11,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-82787————
—— G-2-140659————

Formation tops

As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →

FormationMD ftSubsea
Pettus3,500-3,138
Sparta5,682-5,320
Queen City6,637-6,275
Wilcox8,720-8,358
WilcoxWILCOX LULING SAND9,269-8,907

Perforations

Perforated and open-hole intervals.

FromToType
9,4829,498Perforated
9,5039,511Perforated
9,5489,558Perforated
9,5729,576Perforated
9,6089,625Perforated
9,8349,872Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1632——
10.751,52014.75900 S
2.8756,266——
7.6256,7829.8751,200 S
510,496——
16———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 14, 1992Feb 14, 1992Yes
00Feb 28, 1992——
00Jan 12, 1984Feb 20, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113943W-14 DisposalNot activated6,0001,4002,850–4,600

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29731852, documented in the API reference.