WELL · 42-297-32610 · DISTRICT 2

West George Estate #4

Plugged

Live Oak County · George West West (10900 Wilcox) field  · Vertical

West George Estate #4 (API 42-297-32610) is a plugged well in Live Oak County, plugged December 22, 2025, last operated by Byng Energy Group Inc..

The RRC has issued 2 drilling permits (amended once) between 1980 and 1994, permitted to 13,000 ft.

It was permitted by Michael Petroleum Corporation and has since transferred to Byng Energy Group Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Queen City, Wilcox.

Operator of record

Byng Energy Group Inc.

Permitted by Michael Petroleum Corporation; the EWA schedule now lists a different operator.

Enid, OK · P-5 Y, filed Nov 4, 2025 · (580) 213-3630

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleByng Energy Group Inc.
Production reportsTeton Petroleum Corporationthrough Oct 1996
Latest permitMichael Petroleum CorporationJun 21, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
3
permits on file
Jun 21, 1994
last permit issued
Nov 17, 1994
completed
0
cumulative oil, bbl
150K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 17, 1994
Shut in
—
Plugged
Dec 22, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, George Estate G-2-152273George West, West (10900 Wilcox)Byng Energy Group, Inc.10101KNov 1994 – Dec 2025
West, George Estate G-2-99000George West, West (8600)Michael Petroleum Corporation1024.2KJan 1993 – Nov 1994
West, George Estate G-2-99079George West, West (8500)Michael Petroleum Corporation1024.5KJan 1993 – Nov 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Teton Petroleum CorporationJan 1993 → Oct 1996
  2. 2Michael Petroleum CorporationJun 1994 → Nov 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
425141-98RecompletionMichael Petroleum CorporationSep 12, 1994Jun 21, 1994—13,000
425141-99RecompletionMichael Petroleum CorporationJun 21, 1994Jun 21, 1994Aug 20, 199413,000
100498-99DrillCarr, F. WilliamNov 26, 1980Nov 26, 1980—10,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-99000————
—— G-2-99079————
—— G-2-152273————

Formation tops

As filed on W-2/G-1. Subsea from 310 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City5,870-5,560
Wilcox7,240-6,930

Perforations

Perforated and open-hole intervals.

FromToType
8,5658,588Perforated
8,6908,722Perforated
10,71010,732Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,069171,028 S
9.6258,18812.251,550 S
2.87510,9995.875230 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 29, 1995Nov 23, 1994Yes
00Jan 11, 1995——
00Jan 12, 1984Mar 30, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29732610, documented in the API reference.