WELL · 42-297-32636 · DISTRICT 2
Sullivan James D. #8
Live Oak County · Maxine East (9700) field · Vertical
Sullivan James D. #8 (API 42-297-32636) is a well in Live Oak County operated by Tejones Operating Corporation, completed May 18, 1981.
The RRC has issued 2 drilling permits between 1981 and 2006, permitted to 10,500 ft.
Completion filings report 5 formation tops, including Frio, Vicksburg, Pettus, Yegua.
No lease production has been reported under this well’s leases.
Operator of record
San Antonio, TX · P-5 Y, filed Aug 8, 2014 · 13 permits on file · (210) 601-5614
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tejones Operating Corporation |
| Production reports | Gouger Oil Company, LLCthrough Mar 2026 |
| Latest permit | Tejones Operating CorporationJun 30, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 2
- permits on file
- Jun 30, 2006
- last permit issued
- May 18, 1981
- completed
- 0
- cumulative oil, bbl
- 2.33M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 18, 1981
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sullivan Unit G-2-221029 | Maxine, East (9100) | Gouger Oil Company, LLC | 1 | 0 | 529K | May 2006 – Jul 2026 |
| Sullivan, James D. G-2-93679 | Maxine, East (9700) | Tejones Operating Corporation | 1 | 0 | 1.8M | Jan 1993 – May 2006 |
Gas, mcf lease total
Last 12 months 2,180 · prior 12 2,177(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Freeman, James C.Jan 1993 → May 1999
- 2Tejones Operating CorporationJun 1999 → May 2013
- 3Kidd Production Co.Jun 2013 → Dec 2014
- 4Brander, Sam H.Jan 2015 → Mar 2018
- 5Gouger Oil Company, LLCApr 2018 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 621821-99 | Recompletion | Tejones Operating Corporation | Jun 29, 2006 | Jun 30, 2006 | — | 9,782 |
| 106299-99 | Drill | McCarrick, Gouger & Mitchell | Jan 22, 1981 | Jan 22, 1981 | — | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-93679 | — | — | — | — |
| — | — G-2-221029 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 294 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,039 | 9,048 | Perforated |
| 9,700 | 9,718 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,796 | 14.75 | 330 S |
| 7 | 8,100 | 9.875 | 500 S |
| 2.375 | 9,658 | — | — |
| 5 | 9,782 | 6.125 | 160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 5, 2007 | Mar 30, 2007 | — |
| 00 | Mar 28, 2007 | Sep 7, 2006 | — |
| 00 | Mar 21, 2007 | Jul 14, 2006 | Yes |
| 00 | Nov 8, 2006 | — | — |
| 00 | Jan 12, 1984 | Jun 9, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-32636 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-32636 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29732636, documented in the API reference.