WELL · 42-297-32756 · DISTRICT 2
Herring Ranch 67-1 #1
Live Oak County · Maxine East (9700) field · Vertical
Herring Ranch 67-1 #1 (API 42-297-32756) is a well in Live Oak County operated by Flynn Energy Corp., completed November 15, 1981.
The RRC has issued 2 drilling permits between 1981 and 1982, permitted to 10,000 ft.
No lease production has been reported under this well’s leases.
Operator of record
Tulsa, OK · P-5 Y, filed Feb 15, 1990 · 41 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Flynn Energy Corp. |
| Production reports | SM Operating Company LLCthrough Mar 2026 |
| Latest permit | Flynn Energy Corp.Oct 27, 1982 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 2
- permits on file
- Oct 27, 1982
- last permit issued
- Nov 15, 1981
- completed
- 0
- cumulative oil, bbl
- 1.41M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 15, 1981
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Herring Ranch 67-1 G-2-102317 | Maxine, East (8700) | SM Operating Company LLC | 1 | 0 | 1.41M | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,946 · prior 12 5,606(-12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Nueces Oil CompanyJan 1993 → Feb 1995
- 2Mueller Engineering Corp.Mar 1995 → Jul 1996
- 3Acock Engineering & Assoc., Inc.Aug 1996 → Jul 2002
- 4Acock/Anaqua Operating Co., LCAug 2002 → Apr 2004
- 5Acock/Anaqua Operating Co., LPMay 2004 → May 2006
- 6Acock Operating LimitedJun 2006 → Sep 2014
- 7Geiser Operating, Inc.Oct 2014 → Nov 2016
- 8G Force Energy, LLCDec 2016 → Dec 2019
- 9SM Operating Company LLCJan 2020 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 175615-99 | Recompletion | Flynn Energy Corp. | Oct 27, 1982 | Oct 27, 1982 | — | 8,714 |
| 132367-99 | Drill | Flynn Energy Corp. | Sep 4, 1981 | Sep 4, 1981 | Sep 23, 1981 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-102317 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,704 | 8,707 | Perforated |
| 9,767 | 9,787 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,995 | 14.75 | 670 S |
| 2.375 | 7,999 | — | — |
| 7.625 | 8,133 | 9.875 | 445 S |
| 2.375 | 8,496 | — | — |
| 5 | 9,859 | 6.5 | 220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Aug 18, 1982 | — |
| 00 | Jan 12, 1984 | Feb 10, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-32756 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-32756 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29732756, documented in the API reference.