WELL · 42-297-32796 · DISTRICT 2

Cartwright Holman #94

Plugged

Live Oak County · Mount Lucas (2400) field  · Vertical

Cartwright Holman #94 (API 42-297-32796) is a plugged well in Live Oak County, plugged March 6, 2013, last operated by Cologne Production Company.

The RRC has issued 3 drilling permits between 1981 and 1991, permitted to 5,000 ft.

Completion filings report one formation top, including Het Sand.

Its 3 leases have reported 16.7K barrels of oil and 19.9K mcf of gas since January 1993, last reporting in November 2013. The leases carry 17 wells, so these are lease totals, not this well alone.

Operator of record

Cologne Production Company

San Antonio, TX · P-5 Inactive, filed Mar 28, 2014 · 200 permits on file · (210) 824-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCologne Production Company
Production reportsCologne Production Companythrough Jul 2001
Latest permitCologne Production Co.May 14, 1991
5,000
total depth, ft
3
permits on file
May 14, 1991
last permit issued
May 15, 1991
completed
16.7K
cumulative oil, bbl
19.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 15, 1991
Shut in
—
Plugged
Mar 6, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cartwright, Holman O-2-6174Holman (Hockley 2ND)Cologne Production Company1616.7K19.9KJan 1993 – Nov 2013
Cartwright, Holman G-2-138826Mount Lucas (2400)Cologne Production Company100Jan 1993 – Mar 2013
— G-2-137759——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cologne Production CompanyJan 1993 → Jul 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387769-99RecompletionCologne Production Co.May 10, 1991May 14, 1991May 15, 19914,759
378035-99RecompletionCologne Production Co.Sep 17, 1990Sep 21, 1990Nov 2, 19904,759
134539-99DrillCologne Production Co.Sep 24, 1981Sep 24, 1981—5,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-137759————
—— G-2-138826————
—— O-2-6174————

Formation tops

As filed on W-2/G-1. Subsea from 140 ft elevation.Download CSV →

FormationMD ftSubsea
Het Sand2,306-2,166

Perforations

Perforated and open-hole intervals.

FromToType
2,3282,340Perforated
4,3044,315Perforated
4,4994,516Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62551412.25245 S
2.3754,370——
4.54,6097.875910 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 7, 1992Feb 18, 1992—
00Sep 18, 1991Jul 1, 1991—
00Aug 2, 1991——
00Jun 25, 1991Dec 17, 1990Yes
00Apr 25, 1991——
00May 18, 1988Apr 5, 1988—
00Jan 12, 1984Oct 15, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
60.4K
bbl, all reported
Nov 2013
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000064821H-1 InjectionPlugged Mar 18, 20134001,0004,499–4,516
000075919W-14 DisposalPlugged Mar 18, 20134001,1502,328–2,340

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120122013

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29732796, documented in the API reference.