WELL · 42-297-33838 · DISTRICT 2
Hinnant W. #3
Live Oak County · Hinnant (2200) field · Vertical
Hinnant W. #3 (API 42-297-33838) is a plugged well in Live Oak County, plugged April 29, 2011, last operated by Royal Production Company Inc..
The RRC has issued one drilling permit, issued July 19, 1988, permitted to 2,300 ft.
It was permitted by Hyquest Energy, Inc. and has since transferred to Royal Production Company Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Hinnant (Miocene 1660), Hinnant (2040), Discorbis.
Operator of record
Permitted by Hyquest Energy, Inc.; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Dec 4, 2025 · 235 permits on file · (361) 888-4792
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Royal Production Company Inc. |
| Production reports | Hyquest Energy, Inc.through Mar 2010 |
| Latest permit | Hyquest Energy, Inc.Jul 19, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,300
- total depth, ft
- 1
- permits on file
- Jul 19, 1988
- last permit issued
- Aug 11, 1988
- completed
- 0
- cumulative oil, bbl
- 19.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 11, 1988
- Shut in
- —
- Plugged
- Apr 29, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hinnant, W. G-2-129363 | Hinnant (2200) | Royal Production Company, Inc. | 1 | 0 | 19.3K | Jan 1993 – Apr 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hyquest Energy, Inc.Jan 1993 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 348928-99 | Drill | Hyquest Energy, Inc. | Jul 15, 1988 | Jul 19, 1988 | Aug 4, 1988 | 2,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-129363 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 173 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hinnant (Miocene 1660) | 1,584 | -1,411 |
| Hinnant (2040) | 2,002 | -1,829 |
| Discorbis | 2,128 | -1,955 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,183 | 2,186 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 627 | 12.25 | 192 S |
| 4.5 | 2,310 | 7.875 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 7, 1989 | Oct 31, 1988 | Yes |
| 00 | Feb 2, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-33838 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-33838 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29733838, documented in the API reference.