WELL · 42-297-34359 · DISTRICT 2

Wood Brothers #1

Plugged

Live Oak County  · Vertical

Wood Brothers #1 (API 42-297-34359) is a plugged well in Live Oak County, plugged August 26, 2004, last operated by Lindholm Oil, Inc..

The RRC has issued 2 drilling permits in 1999, permitted to 6,500 ft.

Operator of record

Lindholm Oil, Inc.

Mathis, TX · P-5 Y, filed Jan 5, 2007 · 47 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLindholm Oil, Inc.Jul 9, 1999
6,500
total depth, ft
2
permits on file
Jul 9, 1999
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 26, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
485760-99ReenterLindholm Oil, Inc.Jul 9, 1999Jul 9, 1999Jul 19, 19996,500
485256-99DrillLindholm Oil, Inc.Jun 16, 1999Jun 16, 1999Jun 26, 19996,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29734359, documented in the API reference.