WELL · 42-297-34362 · DISTRICT 2
Bonilla #1
Live Oak County · Directional
Bonilla #1 (API 42-297-34362) is a permitted well in Live Oak County filed by Petrohawk Operating Company; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 1999 and 2007, permitted to 14,500 ft.
Completion filings report 5 formation tops, including Slick A, Slick B, Luling, Hostetter.
Operator of record
Houston, TX · P-5 Y, filed Oct 13, 2017 · 1,334 permits on file · (877) 452-4294
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Proline Energy Resources Incthrough Jul 2019 |
| Latest permit | Petrohawk Operating CompanyMay 15, 2007 |
- 14,500
- total depth, ft
- 3
- permits on file
- May 15, 2007
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.43M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bonilla G-2-177149 | Mikeska (Massive Wilcox) | Proline Energy Resources Inc | 1 | 0 | 1.43M | Jan 2000 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Greenbrier Oper. Co.Jan 2000 → May 2000
- 2Wynn-Crosby Energy, Inc.Jun 2000 → May 2005
- 3Petrohawk Operating CompanyJun 2005 → Nov 2007
- 4Milagro Exploration, LLCDec 2007 → Oct 2015
- 5White Oak Operating Company LLCNov 2015 → Jul 2016
- 6Proline Energy Resources IncJun 2019 → Jul 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 638312-99 | Recompletion | Petrohawk Operating Company | May 3, 2007 | May 15, 2007 | — | 12,600 |
| 486840-98 | Drill | Greenbrier Oper. Co. | Apr 27, 2000 | Aug 20, 1999 | — | 13,700 |
| 486840-99 | Drill | Greenbrier Oper. Co. | Aug 20, 1999 | Aug 20, 1999 | Sep 12, 1999 | 14,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-177149 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Slick A | 9,983 | -9,709 |
| Slick B | 10,534 | -10,260 |
| Luling | 11,100 | -10,826 |
| Hostetter | 11,840 | -11,566 |
| Massive | 13,100 | -12,826 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,784 | 12,802 | Perforated |
| 12,922 | 12,935 | Perforated |
| 13,010 | 13,024 | Perforated |
| 13,177 | 13,190 | Perforated |
| 13,484 | 13,494 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,800 | 17.5 | 770 S |
| 9.625 | 8,485 | 10.5 | 1,140 S |
| 5.5 | 13,700 | 6.5 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 18, 2003 | Dec 30, 2002 | — |
| 00 | Jul 26, 2000 | Feb 2, 2000 | Yes |
| 00 | Jun 8, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-34362 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-34362 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29734362, documented in the API reference.