WELL · 42-297-34363 · DISTRICT 2
Davidson, Mary #2
Live Oak County · Vertical
Davidson, Mary #2 (API 42-297-34363) is a plugged well in Live Oak County, plugged February 29, 2000, last operated by Lamay Corporation.
The RRC has issued 3 drilling permits between 1999 and 2004, permitted to 5,500 ft.
Its 2 leases have reported 28.7K barrels of oil and 84.9K mcf of gas since March 2001, last reporting in August 2023. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Rosenberg, TX · P-5 Y, filed Apr 4, 2026 · 19 permits on file · (281) 342-8837
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cimarron Engineering, LLCthrough Aug 2021 |
| Latest permit | Lamay CorporationJan 5, 2004 |
- 5,500
- total depth, ft
- 3
- permits on file
- Jan 5, 2004
- last permit issued
- —
- completed
- 28.7K
- cumulative oil, bbl
- 84.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Aug 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 29, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davidson, Mary O-2-8836 | Ramirena, SW. (Yegua #2 Sd.) | Cimarron Engineering, LLC | 1 | 23.6K | 48.3K | Oct 2003 – Aug 2023 |
| Davidson O-2-8615 | Ramirena, SW. (Jackson Sd.) | Lamay Corporation | 1 | 5.14K | 36.6K | Mar 2001 – Mar 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lamay CorporationMar 2001 → Sep 2014
- 2Hart Petroleum Services, IncOct 2014 → Oct 2015
- 3Cimarron Engineering, LLCNov 2015 → Aug 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 537881-99 | Recompletion | Lamay Corporation | Oct 24, 2003 | Jan 5, 2004 | Sep 3, 2003 | 5,305 |
| 507232-99 | Reenter | Lamay Corporation | Mar 30, 2001 | Apr 4, 2001 | Jan 21, 2001 | 5,305 |
| 486940-99 | Drill | Tidal Petroleum, Inc. | Aug 25, 1999 | Aug 25, 1999 | Sep 4, 1999 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-8615 | — | — | — | — |
| — | — O-2-8836 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,541 | 4,545 | Perforated |
| 5,172 | 5,178 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 560 | 12.25 | 230 S |
| 4.5 | 5,257 | 7.875 | 855 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 2004 | Oct 23, 2003 | Yes |
| 00 | Jan 30, 2004 | Mar 30, 2001 | — |
| 00 | Aug 22, 2001 | Mar 30, 2001 | — |
| 00 | May 14, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-34363 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-34363 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29734363, documented in the API reference.