WELL · 42-297-34393 · DISTRICT 2

Burlington Fee 301 #1

Plugged

Live Oak County · Chapa West (Luling) field  · Vertical

Burlington Fee 301 #1 (API 42-297-34393) is a plugged well in Live Oak County, plugged October 19, 2020, last operated by Tidewater Minerals Corporation.

The RRC has issued 2 drilling permits (amended once) between 2000 and 2008, permitted to 15,000 ft.

It was permitted by Quantum Resources Management,LLC and has since transferred to Tidewater Minerals Corporation on the wellbore schedule.

Completion filings report 6 formation tops, including Queen City, Slick, First Tom Lyne, Second Tom Lyne.

Operator of record

Tidewater Minerals Corporation

Permitted by Quantum Resources Management,llc; the EWA schedule now lists a different operator.

Orange Grove, TX · P-5 Y, filed Feb 4, 2026 · 10 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTidewater Minerals Corporation
Production reportsTidewater Minerals Corporationthrough Feb 2013
Latest permitQuantum Resources Management,llcDec 1, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
3
permits on file
Dec 1, 2008
last permit issued
Oct 17, 2008
completed
0
cumulative oil, bbl
135K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Oct 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 17, 2008
Shut in
—
Plugged
Oct 19, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burlington Fee 301 G-2-252185Chapa, West (Luling)Tidewater Minerals Corporation105.19KOct 2008 – Oct 2020
Burlington Fee 301 G-2-187164Chapa, East Deep (Massive B)Tidewater Minerals Corporation10130KJul 2001 – Mar 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJul 2001 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Mar 2007
  3. 3Quantum Resources Management,llcApr 2007 → Apr 2008
  4. 4Tidewater Minerals CorporationDec 2009 → Feb 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
675241-98RecompletionQuantum Resources Management,llcAug 11, 2009Dec 1, 2008Jul 26, 200813,542
675241-99RecompletionQuantum Resources Management,llcNov 19, 2008Dec 1, 2008—11,500
493886-99DrillHanson Production CompanyApr 7, 2000Apr 7, 2000Apr 11, 200015,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-187164————
—— G-2-252185————

Formation tops

As filed on W-2/G-1. Subsea from 368 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City6,839-6,471
Slick10,540-10,172
First Tom Lyne11,760-11,392
Second Tom Lyne12,610-12,242
"Massive" A13,140-12,772
"Massive" B13,821-13,453

Perforations

Perforated and open-hole intervals.

FromToType
11,41411,426Perforated
13,86813,882Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,00017.51,376 S
9.6259,49612.25730 S
4.514,6088.5870 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 27, 2011Dec 11, 2008Yes
00Oct 30, 2009——
00Apr 30, 2002Aug 27, 2001Yes
00Mar 4, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29734393, documented in the API reference.