WELL · 42-297-34420 · DISTRICT 2
McNeill #2
Live Oak County · Vertical
Mcneill #2 (API 42-297-34420) is a permitted well in Live Oak County filed by Cimarron Engineering Corp.; no completion report is on file yet.
The RRC has issued 3 drilling permits (amended once) between 2001 and 2009, permitted to 5,500 ft.
Completion filings report 2 formation tops, including Lucille, Yegua.
Its lease has reported 5.97K barrels of oil and 99.9K mcf of gas since March 2001, last reporting in July 2026.
Operator of record
Kingsville, TX · P-5 Y, filed Sep 2, 2016 · 74 permits on file · (361) 522-2053
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cimarron Engineering, LLCthrough Jan 2019 |
| Latest permit | Cimarron Engineering Corp.Mar 17, 2009 |
- 5,500
- total depth, ft
- 4
- permits on file
- Mar 17, 2009
- last permit issued
- —
- completed
- 5.97K
- cumulative oil, bbl
- 99.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McNeil O-2-8641 | Jackson Ranch (Yegua 5400) | Cimarron Engineering, LLC | 1 | 5.97K | 99.9K | Mar 2001 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Can-Tex Energy Corp.Mar 2001 → Oct 2001
- 2Cimarron Engineering Corp.Jun 2002 → Sep 2014
- 3Cimarron Engineering, LLCSep 2017 → Jan 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 679251-99 | Recompletion | Cimarron Engineering Corp. | Mar 6, 2009 | Mar 17, 2009 | — | 5,310 |
| 525546-99 | Recompletion | Cimarron Engineering Corp. | Nov 15, 2002 | Nov 25, 2002 | — | 5,410 |
| 505097-98 | Drill | Can-Tex Energy Corp. | May 3, 2001 | Feb 8, 2001 | — | 5,500 |
| 505097-99 | Drill | Rodessa Operating Company | Feb 8, 2001 | Feb 8, 2001 | Feb 9, 2001 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-8641 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 203 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lucille | 4,342 | -4,139 |
| Yegua | 5,090 | -4,887 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,351 | 5,353 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 610 | 12.25 | 265 S |
| 4.5 | 5,450 | 7.875 | 1,070 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 10, 2001 | May 2, 2001 | Yes |
| 00 | Aug 6, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-34420 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-34420 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.