WELL · 42-297-34453 · DISTRICT 2
Three Katz #2
Live Oak County · Tom Lyne NE. (Hockley E) field · Vertical
Three Katz #2 (API 42-297-34453) is a plugged well in Live Oak County, plugged May 30, 2006, last operated by Awp Operating Company.
The RRC has issued 2 drilling permits (amended once) between 2001 and 2002, permitted to 3,500 ft.
Completion filings report 3 formation tops, including Cole, Hockley, Yegua.
Its 2 leases have reported 9.4K barrels of oil and 5K mcf of gas since January 2002, last reporting in July 2006. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
George West, TX · P-5 Y, filed Sep 4, 2025 · 91 permits on file · (210) 508-5763
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Awp Operating Company |
| Production reports | Awp Operating Companythrough Nov 2005 |
| Latest permit | Awp Operating CompanyNov 4, 2002 |
- 3,500
- total depth, ft
- 3
- permits on file
- Nov 4, 2002
- last permit issued
- Jan 15, 2002
- completed
- 9.4K
- cumulative oil, bbl
- 5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2002 THROUGH Jul 2006
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 15, 2002
- Shut in
- —
- Plugged
- May 30, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Three Katz O-2-8754 | Tom Lyne, NE. (Hockley C) | Awp Operating Company | 1 | 9.4K | 277 | Jul 2002 – Jul 2006 |
| Three Katz G-2-190677 | Tom Lyne, NE. (Hockley E) | Awp Operating Company | 1 | 0 | 4.72K | Jan 2002 – Jul 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1U.S. Enercorp, LLCJan 2002 → Jun 2002
- 2Awp Operating CompanyJul 2002 → Aug 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 525146-99 | Recompletion | Awp Operating Company | Oct 31, 2002 | Nov 4, 2002 | Jul 3, 2002 | 3,500 |
| 515648-98 | Drill | U.S. Enercorp, LLC | Feb 25, 2002 | Nov 29, 2001 | — | 3,500 |
| 515648-99 | Drill | U.S. Enercorp, LLC | Nov 28, 2001 | Nov 29, 2001 | Dec 7, 2001 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-190677 | — | — | — | — |
| — | — O-2-8754 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cole | 2,530 | -2,256 |
| Hockley | 2,900 | -2,626 |
| Yegua | 3,300 | -3,026 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,090 | 3,093 | Perforated |
| 3,157 | 3,160 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 690 | 12.25 | 260 S |
| 4.5 | 3,496 | 7.875 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 2003 | Dec 11, 2002 | Yes |
| 00 | Jan 16, 2003 | — | — |
| 00 | Oct 31, 2002 | May 24, 2002 | Yes |
| 00 | Oct 2, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-297-34453 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-297-34453 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/29734453, documented in the API reference.