WELL · 42-297-34761 · DISTRICT 1

Lark #23

Y

Live Oak County · Jacob field · Injection  · Vertical

Lark #23 (API 42-297-34761) is a well in Live Oak County operated by Texas Secondary Oil Corporation, completed October 19, 2012 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued January 23, 2008, permitted to 1,150 ft.

Completion filings report 3 formation tops, including Mirando, Pettus, Jacob.

Its lease has reported 415K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 19 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 30.4K barrels injected in the 12 months reported through January 2026.

Operator of record

Texas Secondary Oil Corporation

Devine, TX · P-5 Y, filed Aug 4, 2025 · 304 permits on file · (830) 538-4004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas Secondary Oil Corporation
Production reportsTexas Secondary Oil Corporationthrough Apr 2026
Latest permitTexas Secondary Oil CorporationJan 23, 2008
1,150
total depth, ft
1
permits on file
Jan 23, 2008
last permit issued
Oct 19, 2012
completed
415K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 19, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lark O-1-10716JacobTexas Secondary Oil Corporation19415K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 8,884 · prior 12 9,955(-11%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tanos Production, Inc.Jan 1993 → Nov 1994
  2. 2Texas Secondary Oil CorporationDec 1994 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
653076-99DrillTexas Secondary Oil CorporationJan 14, 2008Jan 23, 2008Nov 19, 20081,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-10716————

Formation tops

As filed on W-2/G-1. Subsea from 246 ft elevation.Download CSV →

FormationMD ftSubsea
Mirando820-574
Pettus820-574
Pettus991-745
Jacob1,032-786

Perforations

Perforated and open-hole intervals.

FromToType
1,0321,035Perforated
1,0331,038Perforated
1,0611,078Perforated
1,0631,079Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1226.75171 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 4, 2026Jan 22, 2026—
00May 24, 2023Jan 24, 2023—
00Apr 23, 2013Apr 19, 2013—
00Apr 16, 2013Mar 28, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

30.4K
bbl, last 12 reported months
329K
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105257H-1 InjectionActive500400820–1,114

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 30,398 · prior 12 30,520(0%)

01K2K3K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/29734761, documented in the API reference.