WELL · 42-301-30030 · DISTRICT 8

Wheat Louise Unit #1

N

Loving County · Moore-Hooper (Fuss.) field  · Vertical

Wheat Louise Unit #1 (API 42-301-30030) is a well in Loving County operated by Wheeler Energy LLC, completed December 5, 1974.

The RRC has issued one drilling permit, issued May 13, 1991, permitted to 19,122 ft.

It was permitted by Oryx Energy Company and has since transferred to Wheeler Energy LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Lamar, Brush, Canyon, Bone Spring, Wolfcamp.

Its 2 leases have reported 98.7K barrels of oil and 169K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Wheeler Energy LLC

Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Mar 4, 2026 · 4 permits on file · (918) 587-7474

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWheeler Energy LLC
Production reportsRodan, Inc.through Apr 2026
Latest permitOryx Energy CompanyMay 13, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

19,122
total depth, ft
1
permits on file
May 13, 1991
last permit issued
Dec 5, 1974
completed
98.7K
cumulative oil, bbl
169K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 5, 1974
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Louise Wheat Unit O-10-33221Wheat (Cherry Canyon)Rodan, Inc.298.7K169KJan 1993 – Jul 2026
Wheat, Louise Unit G-10-60405Moore-Hooper (Fuss.)Kerr-McGee Oil & Gas Onshore LP100Jan 1993 – Jan 2022

Oil, barrels lease total

Last 12 months 23 · prior 12 1,170(-98%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Panada Exploration, Inc.Jan 1993 → Feb 1993
  2. 2Latex Petroleum CorporationMar 1993 → May 1994
  3. 3Confed Oil IncorporatedJun 1994 → Feb 2000
  4. 4Wheeler Energy Co.Mar 2000 → Jun 2007
  5. 5Wheeler Energy, LLCJul 2007 → Apr 2024
  6. 6Rodan, Inc.May 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387881-99RecompletionOryx Energy CompanyMay 13, 1991May 13, 1991Apr 30, 199119,122

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-60405————
—— O-10-33221————

Formation tops

As filed on W-2/G-1. Subsea from 2,743 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,330-1,587
Brush, Canyon6,493-3,750
Bone Spring8,285-5,542
Wolfcamp10,994-8,251
Atoka15,944-13,201
Barnett16,764-14,021
MississippianMISS.17,894-15,151
Lake Valley18,093-15,350
Woodford18,120-15,377
DevonianDEVONIAN-SILURIAN18,690-15,947
Fusselman19,054-16,311

Perforations

Perforated and open-hole intervals.

FromToType
5,9015,926Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,33517.55,450 S
10.7511,80012.253,430 S
3.517,655——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 29, 1991Jul 3, 1991Yes
00Jul 24, 1991——
00Jan 12, 1984Dec 16, 1974—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30130030, documented in the API reference.