WELL · 42-301-30055 · DISTRICT 8

Johnson -34- #1

Plugged

Loving County · Slash Ranch (Penn) field  · Vertical

Johnson -34- #1 (API 42-301-30055) is a plugged well in Loving County, plugged August 8, 2018, last operated by Shell Western E&P.

The RRC has issued one drilling permit (amended once), issued July 15, 1993, permitted to 17,000 ft.

It was permitted by Jrp Resources, L.C. and has since transferred to Shell Western E&P on the wellbore schedule.

Completion filings report one formation top, including Pennsylvanian.

Operator of record

Shell Western E&P

Permitted by JRP Resources, L.C.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 1,756 permits on file · (713) 454-3197

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShell Western E&P
Production reportsShell Western E&Pthrough Oct 2015
Latest permitJRP Resources, L.C.Jul 15, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,000
total depth, ft
2
permits on file
Jul 15, 1993
last permit issued
Sep 1, 1994
completed
0
cumulative oil, bbl
779K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 1, 1994
Shut in
—
Plugged
Aug 8, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson -34- G-10-154212Slash Ranch (Penn)Shell Western E&P10700KSep 1994 – Aug 2018
Johnson -34- G-10-66524Slash Ranch (Ellenburger)JRP Resources, L.C.1079.3KJan 1993 – Aug 1994

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1JRP Resources, L.C.Oct 1993 → May 1995
  2. 2Gothic Energy CorporationJun 1995 → Aug 1998
  3. 3Gothic Production CorporationSep 1998 → Feb 2001
  4. 4Chesapeake Operating, Inc.Mar 2001 → Sep 2012
  5. 5Shell Western E&POct 2012 → Oct 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
413926-98RecompletionJRP Resources, L.C.Dec 30, 1994Jul 15, 1993Aug 28, 199416,000
413926-99RecompletionJRP Resources, L.C.Jul 15, 1993Jul 15, 1993—17,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-66524————
—— G-10-154212————

Formation tops

As filed on W-2/G-1. Subsea from 2,890 ft elevation.Download CSV →

FormationMD ftSubsea
Pennsylvanian14,908-12,018

Perforations

Perforated and open-hole intervals.

FromToType
14,90814,935Perforated
14,95414,958Perforated
21,25821,378Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,66017.54,000 S
13.3754,660——
13.3754,665——
9.62512,2587.752,200 S
9.62512,25812.252,200 S
9.62512,258—2,200 S
3.519,598——
2.87519,610——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 20, 1995Jan 27, 1995Yes
00Jun 8, 1995——
00Mar 1, 1993Jun 11, 1992—
00Jan 12, 1984May 28, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.