WELL · 42-301-30316 · DISTRICT 8

Linebery #1

Plugged

Loving County · Taffhy (Atoka) field  · Vertical

Linebery #1 (API 42-301-30316) is a plugged well in Loving County, plugged May 27, 1986, last operated by Atapco.

The RRC has issued 3 drilling permits between 1981 and 2011, permitted to 19,700 ft.

It was permitted by Boyd, D. K. Oil And Gas CO.,Inc. and has since transferred to Atapco on the wellbore schedule.

Completion filings report 2 formation tops, including Bell Canyon, Cherry Canyon.

It holds an active disposal or injection permit, with 3.26M barrels injected in the 12 months reported through April 2026.

Operator of record

Atapco

Permitted by Boyd, D. K. Oil and Gas Co.,inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 1, 1999 · 445 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAtapco
Production reportsnone
Latest permitBoyd, D. K. Oil and Gas Co.,inc.Dec 13, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

19,700
total depth, ft
3
permits on file
Dec 13, 2011
last permit issued
Oct 21, 1982
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 21, 1982
Shut in
—
Plugged
May 27, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Linebery O-10-44590Dimmitt (Cherry Canyon)COG Operating LLC100Oct 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
728985-99ReenterBoyd, D. K. Oil and Gas Co.,inc.Nov 28, 2011Dec 13, 2011Sep 4, 20138,780
262845-99RecompletionAtapcoDec 27, 1984Dec 28, 1984—15,950
122589-99DrillAtapcoJun 24, 1981Jun 24, 1981Jun 27, 198119,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-44590————

Formation tops

As filed on W-2/G-1. Subsea from 3,027 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,005-1,978
Cherry Canyon6,040-3,013

Perforations

Perforated and open-hole intervals.

FromToType
6,1216,126Perforated
6,1306,150Perforated
6,2086,237Perforated
6,2656,274Perforated
6,2806,286Perforated
15,41915,840Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
30403610 S
2050526830 S
13.3755,02417.54,100 S
7.7510,0478.51,110 S
3.512,479——
9.62512,66012.251,551 S
9.62512,6608.57,002 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2014Oct 18, 2013—
00Jan 12, 1984Nov 3, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.26M
bbl, last 12 reported months
25.2M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104644W-14 DisposalActive20,0002,5255,050–6,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,264,710 · prior 12 2,801,934(+17%)

0200K400K600K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30130316, documented in the API reference.