WELL · 42-301-30595 · DISTRICT 8

Abernathy 2 #3

Plugged

Loving County · Grice (Delaware) field  · Vertical

Abernathy 2 #3 (API 42-301-30595) is a plugged well in Loving County, plugged May 23, 1995, last operated by Atlantic Operating II LLC.

The RRC has issued one drilling permit, issued October 9, 1984, permitted to 4,750 ft.

It was permitted by Bennett, M. Brad Inc. and has since transferred to Atlantic Operating II LLC on the wellbore schedule.

Completion filings report one formation top, including Delaware.

Its lease has reported 65.3K barrels of oil and 106K mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Atlantic Operating II LLC

Permitted by Bennett, M. Brad Inc.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Jul 4, 2026 · (432) 528-2852

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAtlantic Operating II LLC
Production reportsAtlantic Operating II, LLCthrough Aug 2020
Latest permitBennett, M. Brad Inc.Oct 9, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,750
total depth, ft
1
permits on file
Oct 9, 1984
last permit issued
Nov 3, 1989
completed
65.3K
cumulative oil, bbl
106K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 3, 1989
Shut in
—
Plugged
May 23, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Abernathy 2 O-10-28049Grice (Delaware)Atlantic Operating II, LLC365.3K106KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Western Oil CompanyJan 1993 → Oct 1994
  2. 2Daniel Oil & GasNov 1994 → Nov 2000
  3. 3Headington Oil Company, L.P.Dec 2000 → May 2001
  4. 4Atlantic Operating, Inc.Jun 2001 → Jan 2015
  5. 5Atlantic Resources Company, LLCFeb 2015 → May 2019
  6. 6Atlantic Operating II, LLCJun 2019 → Aug 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
253921-99DrillBennett, M. Brad Inc.Oct 10, 1984Oct 9, 1984—4,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-28049————

Formation tops

As filed on W-2/G-1. Subsea from 2,993 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,460-1,467

Perforations

Perforated and open-hole intervals.

FromToType
4,5284,533Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,01212.25700 S
5.54,6597.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 29, 1989Nov 17, 1989—
00Feb 8, 1985Jan 11, 1985—
00Feb 1, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.45K
bbl, last 12 reported months
461K
bbl, all reported
Jun 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000070814H-1 InjectionPlugged Jun 9, 19958009504,528–4,533

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,454 · prior 12 91,250(-98%)

05K10K19941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30130595, documented in the API reference.