WELL · 42-301-30642 · DISTRICT 8
Haley "36" #2
Loving County · Vertical
Haley "36" #2 (API 42-301-30642) is a permitted well in Loving County filed by Amoco Production Company; no completion report is on file yet.
The RRC has issued 2 drilling permits in 1985, permitted to 23,500 ft.
Completion filings report 6 formation tops, including Bone Spring, Strawn, Morrow, Mississippian.
Operator of record
Houston, TX · P-5 Y, filed May 7, 2004 · 7,201 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | WPX Energy Permian, LLCthrough Jan 2023 |
| Latest permit | Amoco Production CompanyJun 28, 1985 |
- 23,500
- total depth, ft
- 2
- permits on file
- Jun 28, 1985
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 8.14M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haley "36" G-10-122523 | Haley (Strawn) | WPX Energy Permian, LLC | 1 | 0 | 8.14M | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1MW Petroleum CorporationJan 1993 → Dec 1996
- 2Bristol Resources CorporationJan 1997 → Sep 2000
- 3Chaparral (USA) Energy, Inc.Oct 2000 → Sep 2002
- 4Chaparral Energy, L.L.C.Oct 2002 → Feb 2014
- 5RKI Exploration & Production LLCMar 2014 → Apr 2018
- 6WPX Energy Permian, LLCMay 2018 → Jan 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 279446-99 | Drill | Amoco Production Company | Jun 28, 1985 | Jun 28, 1985 | — | 23,500 |
| 275606-99 | Drill | Amoco Production Company | Jun 28, 1985 | May 21, 1985 | — | 23,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-122523 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,955 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bone Spring | 9,157 | -6,202 |
| Strawn | 14,892 | -11,937 |
| Morrow | 16,535 | -13,580 |
| Mississippian | 18,955 | -16,000 |
| Devonian | 20,035 | -17,080 |
| Ellenburger | 22,385 | -19,430 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,935 | 14,944 | Perforated |
| 14,985 | 14,992 | Perforated |
| 15,024 | 15,030 | Perforated |
| 15,037 | 15,046 | Perforated |
| 15,912 | 15,949 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 5,085 | 17.5 | 9,850 S |
| 7.75 | 12,271 | 10.75 | 400 S |
| 10.75 | 12,800 | 12.5 | 1,565 S |
| 10.75 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 2, 1986 | Nov 7, 1986 | Yes |
| 00 | Nov 27, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-30642 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-30642 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30130642, documented in the API reference.