WELL · 42-301-30904 · DISTRICT 8
Zuni 24 #1
Loving County · Zuni (Bell Canyon) field · Vertical
Zuni 24 #1 (API 42-301-30904) is a plugged well in Loving County, plugged October 7, 2025, last operated by Wpx Energy Permian LLC.
The RRC has issued one drilling permit, issued July 12, 1990, permitted to 3,700 ft.
It was permitted by Siete Oil And Gas Corporation and has since transferred to Wpx Energy Permian LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Lamar, Ramsey.
Its lease has reported 12.6K barrels of oil and 381 mcf of gas since January 1993, last reporting in June 2026.
Operator of record
Permitted by Siete Oil and Gas Corporation; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 956 permits on file · (800) 465-8314
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | WPX Energy Permian LLC |
| Production reports | RKI Exploration & Production LLCthrough Dec 2016 |
| Latest permit | Siete Oil and Gas CorporationJul 12, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- Jul 12, 1990
- last permit issued
- Aug 16, 1990
- completed
- 12.6K
- cumulative oil, bbl
- 381
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 16, 1990
- Shut in
- —
- Plugged
- Oct 7, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Zuni "24" O-10-32813 | Zuni (Bell Canyon) | WPX Energy Permian, LLC | 1 | 12.6K | 381 | Jan 1993 – Jun 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Siete Oil and Gas CorporationJan 1993 → Nov 1994
- 2St. Mary Land & Exploration Co.May 1997 → Nov 2003
- 3Chaparral Energy, L.L.C.Jan 2004 → Feb 2014
- 4RKI Exploration & Production LLCMar 2014 → Dec 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 375382-99 | Drill | Siete Oil and Gas Corporation | Jul 11, 1990 | Jul 12, 1990 | Jul 21, 1990 | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-32813 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,956 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lamar | 3,564 | -608 |
| Ramsey | 3,600 | -644 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,631 | 3,633 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,216 | 12.25 | 720 S |
| 5.5 | 3,618 | 7.875 | 125 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 16, 1990 | Sep 13, 1990 | Yes |
| 00 | Oct 8, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-30904 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-30904 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30130904, documented in the API reference.