WELL · 42-301-30968 · DISTRICT 8

Johnson B 42 A #12

Plugged

Loving County · Jeanita (Cherry Canyon) field  · Vertical

Johnson B 42 A #12 (API 42-301-30968) is a plugged well in Loving County, plugged January 5, 2018, last operated by Rki Exploration & Production LLC.

The RRC has issued one drilling permit, issued December 27, 1990, permitted to 6,000 ft.

It was permitted by Richmond Petroleum Inc. and has since transferred to Rki Exploration & Production LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Lamar, Ramsey, Red Bluff, Cherry Canyon.

Its lease has reported 79.8K barrels of oil and 162K mcf of gas since February 1993, last reporting in April 2018. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

RKI Exploration & Production LLC

Permitted by Richmond Petroleum Inc.; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Feb 4, 2026 · 424 permits on file · (800) 667-6958

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRKI Exploration & Production LLC
Production reportsRKI Exploration & Production LLCthrough Aug 2017
Latest permitRichmond Petroleum Inc.Dec 27, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
Dec 27, 1990
last permit issued
Feb 15, 1993
completed
79.8K
cumulative oil, bbl
162K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1993 THROUGH Apr 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 1993
Shut in
—
Plugged
Jan 5, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson B "42" A O-10-33755Jeanita (Cherry Canyon)RKI Exploration & Production LLC279.8K162KFeb 1993 – Apr 2018

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1JRP Resources, L.C.Feb 1993 → May 1995
  2. 2Gothic Energy CorporationJun 1995 → Aug 1998
  3. 3Gothic Production CorporationSep 1998 → Dec 1998
  4. 4Smith & Marrs Inc.Jan 1999 → Aug 2002
  5. 5BC Operating, Inc.Sep 2002 → Oct 2004
  6. 6Celero Energy, L.P.Dec 2004 → Sep 2005
  7. 7Whiting Oil and Gas CorporationOct 2005 → Jul 2006
  8. 8Chaparral Energy, L.L.C.Aug 2006 → Feb 2014
  9. 9RKI Exploration & Production LLCMar 2014 → Aug 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
382724-99DrillRichmond Petroleum Inc.Dec 27, 1990Dec 27, 1990Jan 19, 19916,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-33755————

Formation tops

As filed on W-2/G-1. Subsea from 2,784 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar2,996-212
Ramsey3,032-248
Red Bluff3,888-1,104
Cherry Canyon3,940-1,156
Cherry CanyonLOWER CHERRY CANYON4,377-1,593

Perforations

Perforated and open-hole intervals.

FromToType
4,5444,630Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,05612.51,015 S
5.54,7437.8751,040 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 26, 1993Mar 5, 1993Yes
00Mar 29, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30130968, documented in the API reference.