WELL · 42-301-31041 · DISTRICT 8
Kyle Sid #2
Loving County · Mason field · Vertical
Kyle Sid #2 (API 42-301-31041) is a plugged well in Loving County, plugged May 28, 2004, last operated by Putnam Paul Oil.
The RRC has issued one drilling permit, issued June 5, 1995, permitted to 3,950 ft.
It was permitted by Dinero Operating Company and has since transferred to Putnam Paul Oil on the wellbore schedule.
Completion filings report one formation top, including T/Ramsey Sand.
Its lease has reported 18K barrels of oil since March 1995, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Dinero Operating Company; the EWA schedule now lists a different operator.
Orla, TX · P-5 Y, filed Mar 4, 2026 · (432) 448-8407
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Putnam Paul Oil |
| Production reports | Putnam, Paul Oilthrough Sep 2022 |
| Latest permit | Dinero Operating CompanyJun 5, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,950
- total depth, ft
- 1
- permits on file
- Jun 5, 1995
- last permit issued
- Jul 10, 1995
- completed
- 18K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 10, 1995
- Shut in
- —
- Plugged
- May 28, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kyle, Sid O-10-34452 | Mason | Putnam, Paul Oil | 2 | 18K | 0 | Mar 1995 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dinero Operating CompanyMar 1995 → Jun 2006
- 2Putnam, Paul OilJul 2006 → Sep 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 436499-99 | Drill | Dinero Operating Company | Jun 2, 1995 | Jun 5, 1995 | Jun 11, 1995 | 3,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-34452 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,059 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Ramsey Sand | 3,860 | -801 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,860 | 3,870 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,105 | 11 | 621 S |
| 5.5 | 3,872 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 16, 1998 | Sep 11, 1998 | Yes |
| 00 | Oct 1, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-31041 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-31041 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30131041, documented in the API reference.