WELL · 42-301-31192 · DISTRICT 8
Mitchell 40 #2
Loving County · Haley (Lwr. Wolfcamp-Penn Cons.) field · Vertical
Mitchell 40 #2 (API 42-301-31192) is a plugged well in Loving County, plugged December 14, 2009, last operated by Anadarko Petroleum Corporation.
The RRC has issued one drilling permit, issued October 12, 2004, permitted to 18,500 ft.
Completion filings report 8 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon, Bone Spring.
Operator of record
Anadarko Petroleum Corporation
Houston, TX · P-5 Delinquent, filed Jun 11, 2012 · 4,004 permits on file · (832) 636-3130
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anadarko Petroleum Corporation |
| Production reports | Anadarko Petroleum Corporationthrough Dec 2007 |
| Latest permit | Anadarko Petroleum CorporationOct 12, 2004 |
- 18,500
- total depth, ft
- 1
- permits on file
- Oct 12, 2004
- last permit issued
- Feb 25, 2005
- completed
- 0
- cumulative oil, bbl
- 613K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2005 THROUGH Dec 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 25, 2005
- Shut in
- —
- Plugged
- Dec 14, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mitchell 40 G-10-209932 | Haley (Lwr. Wolfcamp-Penn Cons.) | Anadarko Petroleum Corporation | 1 | 0 | 613K | Feb 2005 – Dec 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anadarko Petroleum CorporationFeb 2005 → Dec 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 552137-99 | Drill | Anadarko Petroleum Corporation | Oct 11, 2004 | Oct 12, 2004 | Oct 20, 2004 | 18,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-209932 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,896 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 5,220 | -2,324 |
| Cherry Canyon | 6,245 | -3,349 |
| Brushy Canyon | 7,659 | -4,763 |
| Bone SpringBONE SPRINGS | 9,231 | -6,335 |
| Wolfcamp | 11,962 | -9,066 |
| Strawn | 15,003 | -12,107 |
| Atoka | 16,313 | -13,417 |
| Morrow | 16,670 | -13,774 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,230 | 17,352 | Perforated |
| 13,642 | 17,352 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 5,267 | 17.5 | 4,500 S |
| 9.625 | 12,994 | 12.25 | 1,765 S |
| 9.625 | 12,994 | 12.5 | 3,195 S |
| 5.5 | 17,524 | 8.75 | 2,069 S |
| 5.5 | — | 8.75 | 1,430 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 23, 2007 | Dec 21, 2006 | — |
| 00 | Oct 11, 2005 | Jun 27, 2005 | Yes |
| 00 | Aug 10, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-31192 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-31192 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30131192, documented in the API reference.