WELL · 42-301-31424 · DISTRICT 8

June #5

N

Loving County  · Vertical

June #5 (API 42-301-31424) is a former disposal or injection well in Loving County, last operated by Atlantic Operating, Inc.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 2008 and 2014, permitted to 4,900 ft.

Completion filings report 3 formation tops, including Lamar, Ramsey, Bell Canyon.

Its lease has reported 594K barrels of oil and 824K mcf of gas since April 2005, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Atlantic Operating, Inc.

Midland, TX · P-5 Y, filed Nov 7, 2014 · 185 permits on file · (432) 683-3272

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsAtlantic Operating II, LLCthrough Apr 2026
Latest permitAtlantic Operating, Inc.Jan 10, 2014
4,900
total depth, ft
2
permits on file
Jan 10, 2014
last permit issued
—
completed
594K
cumulative oil, bbl
824K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
June O-10-37649Grice (Delaware)Atlantic Operating II, LLC7594K824KApr 2005 – Jul 2026

Oil, barrels lease total

Last 12 months 10,483 · prior 12 11,245(-7%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 16,882 · prior 12 18,621(-9%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Atlantic Operating, Inc.Apr 2005 → Jan 2015
  2. 2Atlantic Resources Company, LLCFeb 2015 → May 2019
  3. 3Atlantic Operating II, LLCJun 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
776277-99ReclassAtlantic Operating, Inc.Dec 26, 2013Jan 10, 2014—4,700
657136-99DrillAtlantic Operating, Inc.Mar 11, 2008Mar 24, 2008May 2, 20084,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-37649————

Formation tops

As filed on W-2/G-1. Subsea from 2,969 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,553-1,584
LamarTOP LAMAR LIME4,553-1,584
Ramsey4,592-1,623
Bell CanyonTOP BELL CANYON RAMSEY SD4,592-1,623

Perforations

Perforated and open-hole intervals.

FromToType
4,5804,614Perforated
4,5804,614Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00712.25350 S
5.54,5807.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 28, 2020Mar 2, 2020—
00Aug 4, 2010Apr 1, 2010—
00Dec 10, 2008Aug 8, 2008Yes
00Nov 19, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.25K
bbl, all reported
Apr 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000100763H-1 InjectionPlugged May 3, 20248001,5004,580–4,614

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30131424, documented in the API reference.