WELL · 42-301-31541 · DISTRICT 8

Christopher #3

Y

Loving County · Dimmitt (Delaware Cons) field · Shut IN  · Vertical

Christopher #3 (API 42-301-31541) is a well in Loving County operated by Last Mile Production LLC, completed August 10, 2010 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued April 20, 2010, permitted to 12,000 ft.

It was permitted by Sandridge Expl. And Prod., LLC and has since transferred to Last Mile Production LLC on the wellbore schedule.

Completion filings report one formation top, including Cherry Canyon.

Its lease has reported 27.7K barrels of oil and 59.8K mcf of gas since August 2010, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Last Mile Production LLC

Permitted by Sandridge Expl. and Prod., LLC; the EWA schedule now lists a different operator.

Southlake, TX · P-5 Delinquent, filed Feb 18, 2025 · (817) 559-7079

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLast Mile Production LLC
Production reportsLast Mile Production, LLCthrough Jul 2024
Latest permitSandridge Expl. and Prod., LLCApr 20, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Apr 20, 2010
last permit issued
Aug 10, 2010
completed
27.7K
cumulative oil, bbl
59.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 10, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christopher O-10-40444Dimmitt (Delaware Cons)Last Mile Production, LLC227.7K59.8KAug 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 212(-100%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sandridge Expl. and Prod., LLCSep 2010 → Jan 2013
  2. 2Sheridan Production Company, LLCFeb 2013 → Feb 2017
  3. 3Iskandia Energy Operating, Inc.Mar 2017 → Dec 2023
  4. 4Last Mile Production, LLCJan 2024 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
694665-99DrillSandridge Expl. and Prod., LLCApr 19, 2010Apr 20, 2010Jun 21, 201012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-40444————

Formation tops

As filed on W-2/G-1. Subsea from 2,891 ft elevation.Download CSV →

FormationMD ftSubsea
Cherry CanyonCHERRY CANYON F6,133-3,242
Cherry CanyonCHERRY CANYON G6,195-3,304
Cherry CanyonCHERRY CANYON I6,359-3,468

Perforations

Perforated and open-hole intervals.

FromToType
6,3586,486Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,09412.25520 S
5.56,5927.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 16, 2011Sep 20, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30131541, documented in the API reference.