WELL · 42-301-32165 · DISTRICT 8

Abernathy 20 #2

Y

Loving County · Red Bluff (Consolidated) field · Injection  · Vertical

Abernathy 20 #2 (API 42-301-32165) is a well in Loving County operated by Stateline Water LLC, completed September 6, 2014 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 17, 2014, permitted to 4,900 ft.

It was permitted by Rki Exploration & Production LLC and has since transferred to Stateline Water LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Delaware, Red Bluff, Cherry Canyon, Bell Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 3.59M barrels injected in the 12 months reported through April 2025.

Operator of record

Stateline Water LLC

Permitted by RKI Exploration & Production LLC; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Aug 4, 2025 · 9 permits on file · (713) 454-7022

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStateline Water LLC
Production reportsnone
Latest permitRKI Exploration & Production LLCApr 17, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
2
permits on file
Apr 17, 2014
last permit issued
Sep 6, 2014
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 6, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Abernathy 20 O-10-45972Red Bluff (Consolidated)Stateline Water, LLC400Jul 2014 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
781978-98DrillRKI Exploration & Production LLCOct 13, 2014Apr 17, 2014Jul 24, 20144,900
781978-99DrillRKI Exploration & Production LLCMar 12, 2014Apr 17, 2014Jul 24, 20144,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-45972————

Formation tops

As filed on W-2/G-1. Subsea from 2,942 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware3,320-378
Red Bluff3,900-958
Cherry Canyon4,500-1,558
Bell Canyon4,700-1,758
AtokaATOKA - HIGH PRESSURE——
Bone SpringBONE SPRINGS——
Brushy Canyon——
Pennsylvanian——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
4,2404,849Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37590617.5815 S
74,9058.75750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 20, 2015Jan 19, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.59M
bbl, last 12 reported months
30.9M
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108020H-1 InjectionActive24,7501,6003,200–4,868

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,590,173 · prior 12 5,141,170(-30%)

0200K400K600K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30132165, documented in the API reference.