WELL · 42-301-33027 · DISTRICT 8

Chapman SWD #2

WaterY

Loving County · Hubbard (Cherry Canyon) field · Injection  · Vertical

Chapman Swd #2 (API 42-301-33027) is a well in Loving County operated by San Mateo Wolf Wtr Resour. LLC, completed November 15, 2016 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 5, 2016, permitted to 6,450 ft.

It was permitted by Fulcrum Delaware Water Res, LLC and has since transferred to San Mateo Wolf Wtr Resour. LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Red Bluff, Delaware, Bell Canyon, Cherry Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 7.14M barrels injected in the 12 months reported through April 2026.

Operator of record

San Mateo Wolf WTR Resour. LLC

Permitted by Fulcrum Delaware Water Res, LLC; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 4, 2026 · (972) 371-5420

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSan Mateo Wolf WTR Resour. LLC
Production reportsnone
Latest permitFulcrum Delaware Water Res, LLCOct 5, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,450
total depth, ft
1
permits on file
Oct 5, 2016
last permit issued
Nov 15, 2016
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 15, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Chapman SWD O-10-45746Hubbard (Cherry Canyon)San Mateo Wolf WTR Resour., LLC200Jan 2015 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
818732-99DrillFulcrum Delaware Water Res, LLCSep 22, 2016Oct 5, 2016Nov 2, 20166,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-45746————

Formation tops

As filed on W-2/G-1. Subsea from 2,675 ft elevation.Download CSV →

FormationMD ftSubsea
Red Bluff1,900775
Delaware4,193-1,518
Bell Canyon4,229-1,554
Cherry Canyon5,237-2,562
Brushy Canyon6,340-3,665
AtokaATOKA - HIGH PRESSURE——
Bone SpringBONE SPRINGS——
Pennsylvanian——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
4,4765,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37580017.5880 S
9.6254,37012.25205 S
76,4398.75434 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 7, 2017Mar 15, 2017Yes
00Mar 27, 2017Feb 16, 2017—
00Oct 31, 2016——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

7.14M
bbl, last 12 reported months
63.7M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111938H-1 InjectionActive25,0002,2004,400–5,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 7,142,537 · prior 12 7,618,355(-6%)

0500K1M20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30133027, documented in the API reference.