WELL · 42-301-33315 · DISTRICT 8

Challenger Fortress SWD 7-1 #2

WaterPlugged

Loving County · Donna (M) field  · Vertical

Challenger Fortress Swd 7-1 #2 (API 42-301-33315) is a plugged well in Loving County, plugged February 21, 2023, last operated by Ngl Water Solutions Permian LLC.

The RRC has issued one drilling permit, issued April 18, 2017, permitted to 7,360 ft.

It was permitted by Hillstone Daco Permian, LLC and has since transferred to Ngl Water Solutions Permian LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Atoka.

Operator of record

NGL Water Solutions Permian LLC

Permitted by Hillstone Daco Permian, LLC; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed May 4, 2026 · 248 permits on file · (303) 597-5652

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNGL Water Solutions Permian LLC
Production reportsnone
Latest permitHillstone Daco Permian, LLCApr 18, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,360
total depth, ft
1
permits on file
Apr 18, 2017
last permit issued
Aug 20, 2021
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2017 THROUGH Jan 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 20, 2021
Shut in
—
Plugged
Feb 21, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Challenger Fortress SWD 7-1 O-10-49076Donna (M)NGL Water Solutions Permian, LLC200Oct 2017 – Jan 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
825112-99DrillHillstone Daco Permian, LLCApr 4, 2017Apr 18, 2017May 3, 20177,360

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-49076————

Formation tops

As filed on W-2/G-1. Subsea from 3,125 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,716-1,591
Bell Canyon4,751-1,626
Cherry Canyon5,807-2,682
AtokaATOKA - HIGH PRESSURE——
Bone SpringBONE SPRINGS——
Brushy Canyon——
Pennsylvanian——
Red Bluff——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
4,7396,825Open hole
4,7396,828Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,07717.5940 S
9.6254,73912.252,012 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 14, 2021Aug 23, 2021—
00Aug 3, 2021Jul 15, 2021—
00Feb 18, 2021Feb 5, 2021—
00Jan 25, 2018Dec 18, 2017—
00Dec 20, 2017——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

155K
bbl, last 12 reported months
21.8M
bbl, all reported
Apr 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114794H-1 InjectionPlugged Apr 3, 202340,0002,3504,700–7,360

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 154,627 · prior 12 742,809(-79%)

050K100K150K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30133315, documented in the API reference.