WELL · 42-301-35461 · DISTRICT 8

Haley 38-47-29E #403H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Haley 38-47-29e #403H (API 42-301-35461) is a horizontal well in Loving County operated by Wpx Energy Permian LLC, completed March 23, 2023 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 14, 2021, permitted to 16,000 ft.

Completion filings report 9 formation tops, including Bell Canyon, Delaware, Cherry Canyon, Brushy Canyon.

Its lease has reported 380K barrels of oil and 604K mcf of gas since December 2022, last reporting in July 2026.

Operator of record

WPX Energy Permian LLC

Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 956 permits on file · (800) 465-8314

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWPX Energy Permian LLC
Production reportsWPX Energy Permian, LLCthrough Mar 2026
Latest permitWPX Energy Permian, LLCMay 14, 2021
16,000
total depth, ft
2
permits on file
May 14, 2021
last permit issued
Mar 23, 2023
completed
380K
cumulative oil, bbl
604K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2022 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 23, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.749795, -103.413105

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Loving County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haley 38-47-29E O-10-58465Phantom (Wolfcamp)WPX Energy Permian, LLC1380K604KDec 2022 – Jul 2026

Oil, barrels lease total

Last 12 months 52,527 · prior 12 93,387(-44%)

020K40K60K202420252026

Gas, mcf lease total

Last 12 months 107,217 · prior 12 143,281(-25%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WPX Energy Permian, LLCMar 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
869720-98DrillWPX Energy Permian, LLCSep 14, 2022May 14, 2021Feb 3, 202316,000
869720-99DrillWPX Energy Permian, LLCMay 7, 2021May 14, 2021Oct 31, 202216,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-58465————

Formation tops

As filed on W-2/G-1. Subsea from 2,893 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,079-2,186
Delaware5,079-2,186
Cherry Canyon6,104-3,211
Brushy Canyon7,335-4,442
Bone Spring8,774-5,881
Bone Spring2ND BONE SPRING9,973-7,080
Bone Spring3RD BONE SPRING10,645-7,752
Wolfcamp11,095-8,202
Pennsylvanian——
Red Bluff——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
12,08619,907Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,13312.25486 S
711,9398.75852 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2023Jun 27, 2023Yes
00Mar 7, 2023Feb 23, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Haley 38-47-29D42-301-35460

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,084-2,191
Delaware5,084-2,191
Cherry Canyon6,101-3,208
Brushy Canyon7,335-4,442
Bone Spring8,775-5,882
Bone Spring8,775-5,882
Bone Spring10,001-7,108
Wolfcamp11,097-8,204

11 TOPS · FIRST 8

Haley 38-47-29C42-301-35456

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,081-2,188
Delaware5,081-2,188
Cherry Canyon6,087-3,194
Brushy Canyon7,338-4,445
Bone Spring8,772-5,879
Bone Spring9,966-7,073
Bone Spring10,631-7,738
Wolfcamp11,123-8,230

12 TOPS · FIRST 8

Haley 38-35-29G42-301-35278

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,070-2,180
Delaware5,070-2,180
Cherry Canyon6,101-3,211
Brushy Canyon7,347-4,457
Bone Spring8,812-5,922
Wolfcamp11,629-8,739
Pennsylvanian—
Atoka—

10 TOPS · FIRST 8

Haley 38-35-29I42-301-35279

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,066-2,176
Delaware5,066-2,176
Cherry Canyon6,128-3,238
Brushy Canyon7,347-4,457
Bone Spring8,791-5,901
Wolfcamp11,636-8,746
Atoka—
Pennsylvanian—

10 TOPS · FIRST 8

Haley 38-35-29H42-301-35277

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,070-2,180
Bell Canyon5,070-2,180
Cherry Canyon6,096-3,206
Brushy Canyon7,331-4,441
Bone Spring8,792-5,902
Wolfcamp11,629-8,739
Pennsylvanian—
Red Bluff—

10 TOPS · FIRST 8

Haley 38-35-29J42-301-35280

0.1 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,072-2,182
Bell Canyon5,072-2,182
Cherry Canyon6,139-3,249
Brushy Canyon7,375-4,485
Bone Spring8,816-5,926
Wolfcamp11,635-8,745
Red Bluff—
Atoka—

10 TOPS · FIRST 8

Haley 38-47-29A42-301-35287

0.2 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,087-2,216
Bell Canyon5,087-2,216
Cherry Canyon6,118-3,247
Brushy Canyon7,359-4,488
Bone Spring8,753-5,882
Wolfcamp11,644-8,773
Pennsylvanian—
Red Bluff—

10 TOPS · FIRST 8

Haley 38-47-29B42-301-35288

0.2 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,085-2,214
Bell Canyon5,085-2,214
Cherry Canyon6,115-3,244
Brushy Canyon7,354-4,483
Bone Spring8,753-5,882
Wolfcamp11,631-8,760
Atoka—
Pennsylvanian—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30135461, documented in the API reference.