WELL · 42-301-35468 · DISTRICT 8

Haley 38-47-29J #401H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Haley 38-47-29j #401H (API 42-301-35468) is a horizontal well in Loving County operated by Wpx Energy Permian LLC, completed April 24, 2023 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 14, 2021, permitted to 16,000 ft.

Completion filings report 10 formation tops, including Bell Canyon, Delaware, Cherry Canyon, Brushy Canyon.

Its lease has reported 234K barrels of oil and 346K mcf of gas since January 2023, last reporting in July 2026.

Operator of record

WPX Energy Permian LLC

Oklahoma City, OK · P-5 Y, filed Sep 4, 2025 · 956 permits on file · (800) 465-8314

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWPX Energy Permian LLC
Production reportsWPX Energy Permian, LLCthrough Mar 2026
Latest permitWPX Energy Permian, LLCMay 14, 2021
16,000
total depth, ft
2
permits on file
May 14, 2021
last permit issued
Apr 24, 2023
completed
234K
cumulative oil, bbl
346K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2023 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 24, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.748092, -103.419510

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Loving County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haley 38-47-29J O-10-58468Phantom (Wolfcamp)WPX Energy Permian, LLC1234K346KJan 2023 – Jul 2026

Oil, barrels lease total

Last 12 months 38,701 · prior 12 59,306(-35%)

020K40K202420252026

Gas, mcf lease total

Last 12 months 62,372 · prior 12 82,027(-24%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WPX Energy Permian, LLCApr 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
869810-98DrillWPX Energy Permian, LLCSep 14, 2022May 14, 2021Feb 10, 202316,000
869810-99DrillWPX Energy Permian, LLCMay 11, 2021May 14, 2021—16,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-58468————

Formation tops

As filed on W-2/G-1. Subsea from 2,900 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,061-2,161
Delaware5,061-2,161
Cherry Canyon6,091-3,191
Brushy Canyon7,308-4,408
Bone Spring8,764-5,864
Wolfcamp11,064-8,164
AtokaATOKA - HIGH PRESSURE——
Pennsylvanian——
Red Bluff——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
12,18920,074Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,09112.25470 S
711,9078.75830 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 2023Jun 27, 2023Yes
00Mar 7, 2023Feb 23, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Haley 38-47-29I42-301-35467

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,070-2,170
Bell Canyon5,070-2,170
Cherry Canyon6,098-3,198
Brushy Canyon7,319-4,419
Bone Spring8,769-5,869
Bone Spring9,940-7,040
Bone Spring10,618-7,718
Wolfcamp11,081-8,181

12 TOPS · FIRST 8

Haley 38-47-29L42-301-35470

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,052-2,152
Bell Canyon5,052-2,152
Cherry Canyon6,092-3,192
Brushy Canyon7,311-4,411
Bone Spring8,752-5,852
Wolfcamp11,063-8,163
Atoka—
Pennsylvanian—

10 TOPS · FIRST 8

Haley 38-35-29B42-301-35285

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,062-2,172
Delaware5,062-2,172
Cherry Canyon6,095-3,205
Brushy Canyon7,311-4,421
Bone Spring8,771-5,881
Wolfcamp11,603-8,713
Red Bluff—
Atoka—

10 TOPS · FIRST 8

Haley 38-35-29A42-301-35286

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,059-2,169
Bell Canyon5,059-2,169
Cherry Canyon6,092-3,202
Brushy Canyon7,203-4,313
Bone Spring8,763-5,873
Wolfcamp11,594-8,704
Atoka—
Pennsylvanian—

10 TOPS · FIRST 8

Haley 38-35-29C42-301-35284

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,062-2,172
Bell Canyon5,062-2,172
Cherry Canyon6,102-3,212
Brushy Canyon7,323-4,433
Bone Spring8,784-5,894
Wolfcamp11,608-8,718
Pennsylvanian—
Red Bluff—

10 TOPS · FIRST 8

Haley 38-35-29E42-301-35283

0.2 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,073-2,183
Delaware5,073-2,183
Cherry Canyon6,102-3,212
Brushy Canyon7,341-4,451
Bone Spring8,803-5,913
Wolfcamp11,618-8,728
Pennsylvanian—
Red Bluff—

10 TOPS · FIRST 8

Haley 38-35-29D42-301-35281

0.2 KM · WPX Energy Permian, LLC · Section with this well →

Delaware5,070-2,180
Bell Canyon5,070-2,180
Cherry Canyon6,108-3,218
Brushy Canyon7,334-4,444
Bone Spring8,784-5,894
Wolfcamp11,614-8,724
Pennsylvanian—
Atoka—

10 TOPS · FIRST 8

Haley 38-35-29F42-301-35282

0.2 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon5,086-2,197
Delaware5,086-2,197
Cherry Canyon6,108-3,219
Brushy Canyon7,344-4,455
Bone Spring8,795-5,906
Wolfcamp11,451-8,562
Devonian—
Morrow—

12 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30135468, documented in the API reference.