WELL · 42-301-35582 · DISTRICT 8
Link-VJ Ranch 55-2-15 Lov NA #1H
Loving County · Phantom (Wolfcamp) field · Producing · Horizontal
Link-VJ Ranch 55-2-15 Lov NA #1H (API 42-301-35582) is a horizontal well in Loving County operated by Pdeh LLC, completed October 3, 2022 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued July 20, 2021, permitted to 11,500 ft.
Completion filings report 7 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Brushy Canyon.
Its lease has reported 431K barrels of oil and 1.38M mcf of gas since October 2022, last reporting in July 2026.
Operator of record
Midland, TX · P-5 Y, filed Oct 4, 2025 · 498 permits on file · (432) 853-2355
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pdeh LLC |
| Production reports | Pdeh LLCthrough Apr 2026 |
| Latest permit | Shell Western E&PJul 20, 2021 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 3
- permits on file
- Jul 20, 2021
- last permit issued
- Oct 3, 2022
- completed
- 431K
- cumulative oil, bbl
- 1.38M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2022 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 3, 2022
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
31.841625, -103.749934
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Loving County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Link-VJ Ranch 55-2-15 Lov NA O-10-58899 | Phantom (Wolfcamp) | Pdeh LLC | 1 | 431K | 1.38M | Oct 2022 – Jul 2026 |
Oil, barrels lease total
Last 12 months 64,964 · prior 12 64,222(+1%)
Gas, mcf lease total
Last 12 months 215,733 · prior 12 200,235(+8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pdeh LLCOct 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 871353-97 | Drill | Pdeh LLC | Feb 1, 2022 | Jul 20, 2021 | Aug 7, 2021 | 11,500 |
| 871353-98 | Drill | Shell Western E&P | Oct 7, 2021 | Jul 20, 2021 | Aug 7, 2021 | 11,500 |
| 871353-99 | Drill | Shell Western E&P | Jul 19, 2021 | Jul 20, 2021 | Aug 7, 2021 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-58899 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,909 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delaware | 3,900 | -991 |
| Bell Canyon | 3,938 | -1,029 |
| Cherry Canyon | 4,879 | -1,970 |
| Brushy Canyon | 6,507 | -3,598 |
| Bone Spring | 7,846 | -4,937 |
| Bone SpringBONE SPRING 1ST | 8,845 | -5,936 |
| Bone SpringBONE SPRING 2ND | 9,425 | -6,516 |
| Bone SpringBONE SPRING 3RD | 10,613 | -7,704 |
| Wolfcamp | 10,880 | -7,971 |
| Red Bluff | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,686 | 20,956 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,204 | 12.25 | 784 S |
| 7.625 | 10,597 | 8.75 | 4,876 S |
| 5.5 | 10,680 | 6.75 | 1,178 S |
| 4.5 | 21,097 | 6.75 | 1,178 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 12, 2023 | Apr 13, 2023 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-35582 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-35582 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Link-VJ Ranch 55-2-15 Lov NB42-301-35583
0.0 KM · Shell Western E&P · Section with this well →
| Delaware | 3,942 | -1,033 |
| Bell Canyon | 3,971 | -1,062 |
| Cherry Canyon | 4,896 | -1,987 |
| Brushy Canyon | 6,533 | -3,624 |
| Bone Spring | 7,883 | -4,974 |
| Bone Spring | 8,865 | -5,956 |
| Bone Spring | 9,461 | -6,552 |
| Bone Spring | 10,616 | -7,707 |
10 TOPS · FIRST 8
Link-VJ Ranch 55-2-15 Lov NE42-301-35669
0.0 KM · Shell Western E&P · Section with this well →
| Delaware | 3,938 | -1,029 |
| Bell Canyon | 3,962 | -1,053 |
| Cherry Canyon | 4,918 | -2,009 |
| Brushy Canyon | 6,558 | -3,649 |
| Bone Spring | 7,904 | -4,995 |
| Bone Spring | 8,896 | -5,987 |
| Bone Spring | 9,508 | -6,599 |
| Bone Spring | 10,637 | -7,728 |
10 TOPS · FIRST 8
Link-VJ Ranch 55-2-15 Lov NC42-301-35584
0.0 KM · Shell Western E&P · Section with this well →
| Delaware | 3,919 | -1,010 |
| Bell Canyon | 3,951 | -1,042 |
| Cherry Canyon | 4,913 | -2,004 |
| Brushy Canyon | 6,547 | -3,638 |
| Bone Spring | 7,882 | -4,973 |
| Wolfcamp | 10,923 | -8,014 |
| Atoka | — | |
| Pennsylvanian | — |
10 TOPS · FIRST 8
VJ Ranch-Link 55-2-22 Lov SA42-301-35634
0.0 KM · Shell Western E&P · Section with this well →
| Delaware | 3,899 | -990 |
| Bell Canyon | 3,948 | -1,039 |
| Cherry Canyon | 4,898 | -1,989 |
| Brushy Canyon | 6,520 | -3,611 |
| Bone Spring | 7,838 | -4,929 |
| Bone Spring | 8,811 | -5,902 |
| Bone Spring | 9,446 | -6,537 |
| Wolfcamp | 10,894 | -7,985 |
10 TOPS · FIRST 8
VJ Ranch-Link 55-2-22 Lov SB42-301-35635
0.0 KM · Shell Western E&P · Section with this well →
| Delaware | 3,923 | -1,014 |
| Bell Canyon | 3,948 | -1,039 |
| Cherry Canyon | 4,903 | -1,994 |
| Brushy Canyon | 6,539 | -3,630 |
| Bone Spring | 7,852 | -4,943 |
| Wolfcamp | 10,909 | -8,000 |
| Pennsylvanian | — | |
| Atoka | — |
10 TOPS · FIRST 8
VJ Ranch-Link 55-2-22 Lov SC42-301-35636
0.1 KM · Shell Western E&P · Section with this well →
| Delaware | 3,926 | -1,017 |
| Bell Canyon | 3,962 | -1,053 |
| Cherry Canyon | 4,901 | -1,992 |
| Brushy Canyon | 6,537 | -3,628 |
| Bone Spring | 7,841 | -4,932 |
| Bone Spring | 8,970 | -6,061 |
| Bone Spring | 9,370 | -6,461 |
| Wolfcamp | 10,830 | -7,921 |
10 TOPS · FIRST 8
VJ Ranch-Link 55-2-22 Lov SD42-301-35637
0.1 KM · Shell Western E&P · Section with this well →
| Delaware | 3,938 | -1,029 |
| Bell Canyon | 3,962 | -1,053 |
| Cherry Canyon | 4,918 | -2,009 |
| Brushy Canyon | 6,558 | -3,649 |
| Bone Spring | 7,904 | -4,995 |
| Bone Spring | 8,896 | -5,987 |
| Bone Spring | 9,508 | -6,599 |
| Wolfcamp | 10,934 | -8,025 |
10 TOPS · FIRST 8
VJ Ranch Link 55-2 F42-301-36686
0.3 KM · Pdeh LLC · Section with this well →
| Delaware | 3,911 | -999 |
| Bell Canyon | 3,958 | -1,046 |
| Cherry Canyon | 4,903 | -1,991 |
| Brushy Canyon | 6,528 | -3,616 |
| Bone Spring | 7,874 | -4,962 |
| Bone Spring | 9,597 | -6,685 |
| Bone Spring | 9,939 | -7,027 |
| Wolfcamp | 11,104 | -8,192 |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30135582, documented in the API reference.