WELL · 42-301-35734 · DISTRICT 8
Bold Johnson 56-T1-26X35 N #W114H
Loving County · Phantom (Wolfcamp) field · Producing · Horizontal
Bold Johnson 56-T1-26x35 N #W114H (API 42-301-35734) is a horizontal well in Loving County operated by Bpx Operating Company, completed December 11, 2022 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued December 29, 2021, permitted to 13,000 ft.
Completion filings report 10 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon, Bone Spring.
No lease production has been reported under this well’s leases.
Operator of record
Denver, CO · P-5 Y, filed May 4, 2026 · 1,576 permits on file · (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BPX Operating Company |
| Production reports | BPX Operating Companythrough Apr 2026 |
| Latest permit | BPX Operating CompanyDec 29, 2021 |
- 13,000
- total depth, ft
- 3
- permits on file
- Dec 29, 2021
- last permit issued
- Dec 11, 2022
- completed
- 0
- cumulative oil, bbl
- 2.34M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2022 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 11, 2022
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
31.942853, -103.830188
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Loving County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bold Johnson 56-T1-26X35 N G-10-294009 | Phantom (Wolfcamp) | BPX Operating Company | 1 | 0 | 2.34M | Dec 2022 – Jul 2026 |
Gas, mcf lease total
Last 12 months 410,155 · prior 12 561,206(-27%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BPX Operating CompanyDec 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 875527-97 | Drill | BPX Operating Company | Dec 16, 2022 | Dec 29, 2021 | Jul 10, 2022 | 13,000 |
| 875527-98 | Drill | BPX Operating Company | Feb 1, 2022 | Dec 29, 2021 | Mar 1, 2022 | 13,000 |
| 875527-99 | Drill | BPX Operating Company | Dec 21, 2021 | Dec 29, 2021 | — | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-294009 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,968 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 3,544 | -576 |
| Cherry Canyon | 4,431 | -1,463 |
| Brushy Canyon | 5,806 | -2,838 |
| Bone Spring | 7,453 | -4,485 |
| Wolfcamp | 10,017 | -7,049 |
| Wolfcamp | 10,578 | -7,610 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Delaware | — | — |
| Pennsylvanian | — | — |
| Red Bluff | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,246 | 18,880 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,463 | 13.5 | 1,807 S |
| 7.625 | 10,787 | 9.875 | 1,695 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 17, 2023 | Jun 9, 2023 | — |
| 00 | Mar 10, 2023 | Jan 20, 2023 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-35734 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-35734 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Bold Johnson 56-T1-26X35 C42-301-35730
0.0 KM · BPX Operating Company · Section with this well →
| Bell Canyon | 3,534 | -591 |
| Cherry Canyon | 4,437 | -1,494 |
| Brushy Canyon | 5,809 | -2,866 |
| Bone Spring | 7,434 | -4,491 |
| Wolfcamp | 10,010 | -7,067 |
| Delaware | — | |
| Strawn | — | |
| Red Bluff | — |
10 TOPS · FIRST 8
Bold Johnson 56-T1-26X35 G42-301-35731
0.0 KM · BPX Operating Company · Section with this well →
| Bell Canyon | 3,536 | -569 |
| Cherry Canyon | 4,445 | -1,478 |
| Brushy Canyon | 5,827 | -2,860 |
| Bone Spring | 7,471 | -4,504 |
| Wolfcamp | 10,022 | -7,055 |
| Atoka | — | |
| Strawn | — | |
| Red Bluff | — |
10 TOPS · FIRST 8
Bold Johnson 56-T1-26X35 XB42-301-35732
0.0 KM · BPX Operating Company · Section with this well →
| Bell Canyon | 3,538 | -569 |
| Cherry Canyon | 4,437 | -1,468 |
| Brushy Canyon | 5,803 | -2,834 |
| Bone Spring | 7,435 | -4,466 |
| Bone Spring | 8,422 | -5,453 |
| Bone Spring | 8,978 | -6,009 |
| Wolfcamp | 9,998 | -7,029 |
| Bone Spring | 10,148 | -7,179 |
13 TOPS · FIRST 8
Bold Johnson 56-T1-26X35 O42-301-35733
0.0 KM · BPX Operating Company · Section with this well →
| Bell Canyon | 3,533 | -564 |
| Cherry Canyon | 4,425 | -1,456 |
| Brushy Canyon | 5,788 | -2,819 |
| Bone Spring | 7,430 | -4,461 |
| Bone Spring | 8,370 | -5,401 |
| Bone Spring | 8,962 | -5,993 |
| Wolfcamp | 9,991 | -7,022 |
| Bone Spring | 10,141 | -7,172 |
13 TOPS · FIRST 8
CBR 2242-301-33473
1.0 KM · RKI Exploration & Production LLC · Section with this well →
| Bell Canyon | 3,492 | -531 |
| Cherry Canyon | 4,586 | -1,625 |
| Brushy Canyon | 5,697 | -2,736 |
| Bone Spring | 7,386 | -4,425 |
| Wolfcamp | 10,514 | -7,553 |
| Atoka | — | |
| Strawn | — | |
| Red Bluff | — |
10 TOPS · FIRST 8
CBR 2242-301-33470
1.0 KM · WPX Energy Permian, LLC · Section with this well →
| Cherry Canyon | 593 | 2,367 |
| Bell Canyon | 3,496 | -536 |
| Brushy Canyon | 5,701 | -2,741 |
| Bone Spring | 7,399 | -4,439 |
| Wolfcamp | 10,540 | -7,580 |
| Pennsylvanian | — | |
| Atoka | — | |
| Strawn | — |
10 TOPS · FIRST 8
Zuni Delaware Unit42-301-30955
1.1 KM · WPX Energy Permian, LLC · Section with this well →
| Lamar | 3,458 | -531 |
| Ramsey | 3,500 | -573 |
Mahogany 24-13L-56-142-301-35518
1.2 KM · WPX Energy Permian, LLC · Section with this well →
| Delaware | 3,550 | -605 |
| Bell Canyon | 3,550 | -605 |
| Cherry Canyon | 4,672 | -1,727 |
| Brushy Canyon | 5,675 | -2,730 |
| Bone Spring | 7,547 | -4,602 |
| Bone Spring | 8,816 | -5,871 |
| Bone Spring | 9,491 | -6,546 |
| Atoka | — |
12 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30135734, documented in the API reference.