WELL · 42-301-35798 · DISTRICT 8

Kashmir SWD #1

WaterY

Loving County · Mason N. (Delaware Sand) field · Injection  · Vertical

Kashmir Swd #1 (API 42-301-35798) is a well in Loving County operated by Waterbridge Stateline LLC, completed July 15, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued February 11, 2022, permitted to 7,700 ft.

Completion filings report 10 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Atoka.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 1.25M barrels injected in the 12 months reported through April 2025; TexNet located 55 M2+ earthquakes within 10 km over the last two years.

Operator of record

Waterbridge Stateline LLC

Houston, TX · P-5 Y, filed Jul 4, 2026 · 86 permits on file · (713) 454-7022

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaterbridge Stateline LLC
Production reportsnone
Latest permitWaterbridge Stateline LLCFeb 11, 2022
7,700
total depth, ft
1
permits on file
Feb 11, 2022
last permit issued
Jul 15, 2022
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2022 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 15, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.963489, -103.765987

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Loving County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kashmir SWD O-10-59433Mason, N. (Delaware Sand)Waterbridge Stateline LLC100Jul 2022 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
876923-99DrillWaterbridge Stateline LLCFeb 9, 2022Feb 11, 2022Mar 20, 20227,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-59433————

Formation tops

As filed on W-2/G-1. Subsea from 3,076 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware3,954-878
Bell Canyon3,960-884
Cherry Canyon4,872-1,796
AtokaATOKA - HIGH PRESSURE——
Bone Spring——
Brushy Canyon——
Pennsylvanian——
Red Bluff——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
4,3426,100Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,81617.51,450 S
9.6254,34212.251,105 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 30, 2023Jul 25, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Lindsay 9-4F-55-142-301-35189

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,952-871
Delaware3,952-871
Cherry Canyon5,041-1,960
Brushy Canyon6,182-3,101
Bone Spring7,954-4,873
Wolfcamp11,071-7,990
Strawn—
Atoka—

10 TOPS · FIRST 8

Lindsay 9-4P-55-142-301-36423

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,932-885
Bell Canyon3,932-885
Cherry Canyon4,852-1,805
Brushy Canyon6,198-3,151
Bone Spring7,986-4,939
Wolfcamp—
Strawn—
Red Bluff—

10 TOPS · FIRST 8

Lindsay 9-4L-55-142-301-36422

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,927-880
Delaware3,927-880
Cherry Canyon4,850-1,803
Brushy Canyon6,197-3,150
Bone Spring7,965-4,918
Bone Spring9,222-6,175
Bone Spring9,895-6,848
Wolfcamp—

12 TOPS · FIRST 8

Lindsay 9-4D-55-142-301-35188

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,954-873
Bell Canyon3,954-873
Cherry Canyon5,043-1,962
Brushy Canyon6,194-3,113
Bone Spring7,964-4,883
Wolfcamp11,079-7,998
Fusselman—
Morrow—

15 TOPS · FIRST 8

Lindsay 9-4Q-55-142-301-36424

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,923-876
Delaware3,923-876
Cherry Canyon4,849-1,802
Brushy Canyon6,188-3,141
Bone Spring7,969-4,922
Bone Spring9,216-6,169
Wolfcamp—
Atoka—

11 TOPS · FIRST 8

Lindsay 9-4B-55-142-301-35100

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,915-836
Cherry Canyon5,038-1,959
Brushy Canyon6,367-3,288
Bone Spring7,950-4,871
Wolfcamp11,079-8,000
Delaware—
Atoka—
Strawn—

10 TOPS · FIRST 8

Lindsay 9-4A-55-142-301-35101

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,912-832
Cherry Canyon5,038-1,958
Brushy Canyon6,349-3,269
Bone Spring7,954-4,874
Wolfcamp—
Strawn—
Red Bluff—
Pennsylvanian—

10 TOPS · FIRST 8

Lindsay 9-4C-55-142-301-35186

0.8 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,952-877
Bell Canyon3,952-877
Cherry Canyon5,043-1,968
Brushy Canyon6,190-3,115
Bone Spring7,966-4,891
Wolfcamp11,090-8,015
Strawn—
Red Bluff—

10 TOPS · FIRST 8

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.25M
bbl, last 12 reported months
5.61M
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000125349H-1 InjectionActive20,0001,0634,250–6,140

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,248,425 · prior 12 1,830,336(-32%)

0100K200K300K20242025

TexNet catalog via USGS

Seismicity near this well

55
M2+ events within 10 km, last 2 years
M3.7
largest

A proximity count, not an attribution. How to read it →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30135798, documented in the API reference.