WELL · 42-301-36100 · DISTRICT 8

Cherry State 56-2-13-1 C #13H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Cherry State 56-2-13-1 C #13H (API 42-301-36100) is a horizontal well in Loving County operated by Anadarko E&P Onshore LLC, completed April 21, 2023 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 26, 2022, permitted to 13,000 ft.

Completion filings report 8 formation tops, including Bell Canyon, Delaware, Red Bluff, Cherry Canyon.

No lease production has been reported under this well’s leases.

Operator of record

Anadarko E&P Onshore LLC

Houston, TX · P-5 Y, filed Sep 4, 2025 · 4,574 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Apr 2026
Latest permitAnadarko E&P Onshore LLCSep 26, 2022
13,000
total depth, ft
1
permits on file
Sep 26, 2022
last permit issued
Apr 21, 2023
completed
0
cumulative oil, bbl
2.61M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2023 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 21, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

31.845811, -103.807159

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Loving County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cherry State 56-2-13-1 C G-10-295454Phantom (Wolfcamp)Anadarko E&P Onshore LLC102.61MApr 2023 – Jul 2026

Gas, mcf lease total

Last 12 months 500,401 · prior 12 598,914(-16%)

0100K200K300K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Onshore LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
884052-99DrillAnadarko E&P Onshore LLCSep 16, 2022Sep 26, 2022Jan 18, 202313,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-295454————

Formation tops

As filed on W-2/G-1. Subsea from 2,781 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon3,469-688
Delaware3,469-688
Red Bluff4,394-1,613
Cherry Canyon4,438-1,657
Brushy Canyon5,595-2,814
Bone Spring7,424-4,643
Bone SpringBONE SPRING 28,598-5,817
Bone SpringBONE SPRING 39,416-6,635
Wolfcamp10,354-7,573
Pennsylvanian——

Perforations

Perforated and open-hole intervals.

FromToType
11,03323,599Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,59417.51,525 S
9.62510,14912.251,844 S
710,3198.52,952 S
5.523,7298.52,952 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 11, 2023Jul 26, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Cherry 56-2-13-1 D42-301-36105

0.0 KM · Anadarko E&P Onshore LLC · Section with this well →

Bell Canyon3,470-689
Delaware3,470-689
Red Bluff4,401-1,620
Cherry Canyon4,444-1,663
Brushy Canyon5,672-2,891
Bone Spring7,436-4,655
Bone Spring8,595-5,814
Bone Spring9,425-6,644

10 TOPS · FIRST 8

Cherry 56-2-13-1 F42-301-36382

0.0 KM · Anadarko E&P Onshore LLC · Section with this well →

Delaware3,466-686
Bell Canyon3,466-686
Red Bluff4,395-1,615
Cherry Canyon4,437-1,657
Brushy Canyon5,602-2,822
Bone Spring7,435-4,655
Bone Spring8,588-5,808
Pennsylvanian—

10 TOPS · FIRST 8

Bonsai 56-2-13-25 E42-301-36383

0.0 KM · Anadarko E&P Onshore LLC · Section with this well →

Delaware3,463-683
Bell Canyon3,463-683
Red Bluff4,395-1,615
Cherry Canyon4,434-1,654
Brushy Canyon5,602-2,822
Bone Spring7,437-4,657
Bone Spring8,594-5,814
Bone Spring9,411-6,631

10 TOPS · FIRST 8

Cherry 56-2-13-1 E42-389-39627

0.9 KM · Anadarko E&P Onshore LLC · Section with this well →

Bell Canyon3,344-593
Delaware3,344-593
Delaware3,373-622
Delaware3,518-767
Cherry Canyon4,338-1,587
Bone Spring7,331-4,580
Bone Spring8,520-5,769
Bone Spring9,202-6,451

10 TOPS · FIRST 8

Cherry 56-2-13-1 B42-389-39626

0.9 KM · Anadarko E&P Onshore LLC · Section with this well →

Bell Canyon3,346-595
Delaware3,346-595
Delaware3,366-615
Delaware3,516-765
Cherry Canyon4,334-1,583
Bone Spring7,343-4,592
Bone Spring8,539-5,788
Bone Spring9,349-6,598

10 TOPS · FIRST 8

Bonsai 56-2-13-25 C42-389-39629

0.9 KM · Anadarko E&P Onshore LLC · Section with this well →

Castile3872,184
Permian (undifferentiated)3872,184
Bell Canyon3,349-778
Delaware3,365-794
Delaware3,365-794
Delaware3,460-889
Cherry Canyon4,337-1,766
Bone Spring7,274-4,703

10 TOPS · FIRST 8

Cherry 56-2-13-1 A42-389-39625

0.9 KM · Anadarko E&P Onshore LLC · Section with this well →

Bell Canyon3,345-594
Delaware3,345-594
Delaware3,362-611
Delaware3,518-767
Cherry Canyon4,329-1,578
Bone Spring7,330-4,579
Bone Spring8,521-5,770
Bone Spring9,326-6,575

10 TOPS · FIRST 8

Bonsai 56-2-13-25 B42-389-39628

0.9 KM · Anadarko E&P Onshore LLC · Section with this well →

Castile3872,363
Permian (undifferentiated)3872,363
Bell Canyon3,346-596
Delaware3,369-619
Delaware3,407-657
Delaware3,463-713
Cherry Canyon4,334-1,584
Bone Spring7,252-4,502

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30136100, documented in the API reference.