WELL · 42-301-36797 · DISTRICT 8
Aerosmith SWD #1
Loving County · Zuma (Delaware) field · Injection · Vertical
Aerosmith Swd #1 (API 42-301-36797) is a well in Loving County operated by Waterbridge Stateline LLC, completed May 10, 2024 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued March 7, 2024, permitted to 8,000 ft.
Completion filings report 10 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Brushy Canyon.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 6.72M barrels injected in the 12 months reported through April 2025; TexNet located 3 M2+ earthquakes within 10 km over the last two years.
Operator of record
Houston, TX · P-5 Y, filed Jul 4, 2026 · 86 permits on file · (713) 454-7022
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Waterbridge Stateline LLC |
| Production reports | none |
| Latest permit | Waterbridge Stateline LLCMar 7, 2024 |
- 8,000
- total depth, ft
- 1
- permits on file
- Mar 7, 2024
- last permit issued
- May 10, 2024
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2024 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 10, 2024
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
31.877534, -103.775297
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Loving County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Aerosmith SWD O-10-61483 | Zuma (Delaware) | Waterbridge Stateline LLC | 1 | 0 | 0 | May 2024 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 897947-99 | Drill | Waterbridge Stateline LLC | Mar 5, 2024 | Mar 7, 2024 | May 1, 2024 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-61483 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,852 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delaware | 3,652 | -800 |
| Bell Canyon | 3,681 | -829 |
| Cherry Canyon | 4,618 | -1,766 |
| Brushy Canyon | 5,756 | -2,904 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Bone Spring | — | — |
| Pennsylvanian | — | — |
| Red Bluff | — | — |
| Strawn | — | — |
| Wolfcamp | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,664 | 5,750 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,165 | 17.5 | 780 S |
| 9.625 | 5,825 | 12.25 | 1,155 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 2024 | Jul 18, 2024 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-36797 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-36797 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
State Pacific 55-T2-842-301-34026
0.8 KM · BHP Billiton Pet(txla OP) Co · Section with this well →
| Bell Canyon | 3,664 | -816 |
| Cherry Canyon | 4,588 | -1,740 |
| Bone Spring | 7,609 | -4,761 |
| Wolfcamp | 10,626 | -7,778 |
| Atoka | — | |
| Strawn | — | |
| Red Bluff | — | |
| Pennsylvanian | — |
10 TOPS · FIRST 8
State Pacific 55-T2-842-301-34027
0.8 KM · BHP Billiton Pet(txla OP) Co · Section with this well →
| Bell Canyon | 3,663 | -816 |
| Cherry Canyon | 4,586 | -1,739 |
| Bone Spring | 7,619 | -4,772 |
| Wolfcamp | 10,651 | -7,804 |
| Atoka | — | |
| Brushy Canyon | — | |
| Delaware | — | |
| Pennsylvanian | — |
10 TOPS · FIRST 8
State Pacific 55-T2-842-301-34028
0.8 KM · BHP Billiton Pet(txla OP) Co · Section with this well →
| Bell Canyon | 3,667 | -819 |
| Cherry Canyon | 4,582 | -1,734 |
| Brushy Canyon | 5,912 | -3,064 |
| Bone Spring | 7,628 | -4,780 |
| Wolfcamp | 10,662 | -7,814 |
| Red Bluff | — | |
| Atoka | — | |
| Strawn | — |
10 TOPS · FIRST 8
Clash SWD42-301-36796
1.6 KM · Waterbridge Stateline LLC · Section with this well →
| Delaware | 3,484 | -670 |
| Bell Canyon | 3,511 | -697 |
| Cherry Canyon | 4,478 | -1,664 |
| Brushy Canyon | 5,783 | -2,969 |
| Strawn | — | |
| Wolfcamp | — | |
| Atoka | — | |
| Bone Spring | — |
10 TOPS · FIRST 8
Mary Swain Harrell A42-301-36911
1.7 KM · CPX Energy Operating, LLC · Section with this well →
| Delaware | 3,514 | -702 |
| Bell Canyon | 3,545 | -733 |
| Cherry Canyon | 4,485 | -1,673 |
| Brushy Canyon | 5,809 | -2,997 |
| Bone Spring | 7,430 | -4,618 |
| Bone Spring | 8,755 | -5,943 |
| Bone Spring | 9,553 | -6,741 |
| Phantom | 9,955 | -7,143 |
10 TOPS · FIRST 8
Bullhead State 55-1-45 Unit B42-301-33871
1.7 KM · Anadarko E&P Onshore LLC · Section with this well →
| Bell Canyon | 3,765 | -872 |
| Delaware | 3,765 | -872 |
| Cherry Canyon | 4,724 | -1,831 |
| Brushy Canyon | 6,128 | -3,235 |
| Bone Spring | 7,650 | -4,757 |
| Wolfcamp | 10,691 | -7,798 |
| Pennsylvanian | — | |
| Strawn | — |
10 TOPS · FIRST 8
Mary Swain Harrell B42-301-36912
1.7 KM · CPX Energy Operating, LLC · Section with this well →
| Delaware | 3,514 | -702 |
| Bell Canyon | 3,556 | -744 |
| Cherry Canyon | 4,486 | -1,674 |
| Brushy Canyon | 5,808 | -2,996 |
| Bone Spring | 7,424 | -4,612 |
| Bone Spring | 8,751 | -5,939 |
| Bone Spring | 9,545 | -6,733 |
| Phantom | 9,948 | -7,136 |
10 TOPS · FIRST 8
Bullhead State 55-1-45 Unit B42-301-33891
1.7 KM · Anadarko E&P Onshore LLC · Section with this well →
| Bell Canyon | 3,765 | -872 |
| Delaware | 3,765 | -872 |
| Cherry Canyon | 4,724 | -1,831 |
| Brushy Canyon | 6,128 | -3,235 |
| Bone Spring | 7,650 | -4,757 |
| Wolfcamp | 10,695 | -7,802 |
| Red Bluff | — | |
| Strawn | — |
10 TOPS · FIRST 8
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 6.72M
- bbl, last 12 reported months
- 6.72M
- bbl, all reported
- Apr 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000125418 | H-1 Injection | Active | 30,000 | 1,825 | 3,650–7,400 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 6,720,746 · prior 12 0
TexNet catalog via USGS
Seismicity near this well
- 3
- M2+ events within 10 km, last 2 years
- M3.0
- largest
A proximity count, not an attribution. How to read it →
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30136797, documented in the API reference.