WELL · 42-303-30736 · DISTRICT 8

Stallings et AL #3

N

Lubbock County · Stinnett SE. (Clear Fork) field  · Vertical

Stallings ET AL #3 (API 42-303-30736) is a well in Lubbock County operated by Texland-Rector & Schumacher, completed December 17, 1981.

The RRC has issued one drilling permit, issued October 30, 1981, permitted to 4,700 ft.

Completion filings report one formation top, including Clear Fork.

Its lease has reported 2.66M barrels of oil and 9.19K mcf of gas since January 1993, last reporting in July 2026. The lease carries 47 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 183K barrels injected in the 12 months reported through March 2026.

Operator of record

Texland-Rector & Schumacher

Fort Worth, TX · P-5 Y, filed Aug 14, 2001 · 836 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexland-Rector & Schumacher
Production reportsTexland Petroleum, L.P.through Apr 2026
Latest permitTexland-Rector & SchumacherOct 30, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,700
total depth, ft
1
permits on file
Oct 30, 1981
last permit issued
Dec 17, 1981
completed
2.66M
cumulative oil, bbl
9.19K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 17, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 47 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
SE. Stinnett Unit O-11-66108Stinnett, SE. (Clear Fork)Texland Petroleum, L.P.472.66M9.19KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 29,570 · prior 12 33,212(-11%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texland-Rector & SchumacherJan 1993 → Nov 2000
  2. 2Texland Petroleum Inc.Dec 2000 → Mar 2003
  3. 3Texland Petroleum, L.P.Apr 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
139086-99DrillTexland-Rector & SchumacherOct 30, 1981Oct 30, 1981Nov 2, 19814,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66108————

Formation tops

As filed on W-2/G-1. Subsea from 3,105 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK4,516-1,411

Perforations

Perforated and open-hole intervals.

FromToType
4,5804,629Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538512.25300 S
2.3754,573——
5.54,6407.8751,400 S
4.54,6407.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 8, 2024Oct 16, 2024—
00May 31, 1988May 6, 1988—
00Feb 24, 1988Dec 30, 1981—
00Feb 23, 1988——
00Jan 12, 1984Dec 30, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

183K
bbl, last 12 reported months
7.54M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000065370H-1 InjectionActive1,0002,0004,580–4,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 183,368 · prior 12 142,298(+29%)

010K20K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30330736, documented in the API reference.