WELL · 42-305-30465 · DISTRICT 8
Monty 438 #1
Lynn County · Vertical
Monty 438 #1 (API 42-305-30465) is a plugged well in Lynn County, plugged December 18, 2006, last operated by Reatta Energy, Inc..
The RRC has issued 2 drilling permits between 2006 and 2010, permitted to 9,500 ft.
Completion filings report one formation top, including Spraberry.
Its lease has reported 69.1K barrels of oil and 5K mcf of gas since November 2010, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Jun 4, 2026 · 61 permits on file · (432) 853-9557
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Reatta Energy, Inc.through Apr 2026 |
| Latest permit | Reatta Energy, Inc.Sep 20, 2010 |
- 9,500
- total depth, ft
- 2
- permits on file
- Sep 20, 2010
- last permit issued
- —
- completed
- 69.1K
- cumulative oil, bbl
- 5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 18, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monty 438 O-11-69625 | Draw, NE. (Spraberry) | Reatta Energy, Inc. | 2 | 69.1K | 5K | Nov 2010 – Jul 2026 |
Oil, barrels lease total
Last 12 months 528 · prior 12 1,985(-73%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Reatta Energy, Inc.Feb 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 702354-99 | Reenter | Reatta Energy, Inc. | Sep 17, 2010 | Sep 20, 2010 | Oct 5, 2010 | 6,400 |
| 627935-99 | Drill | Reatta Energy, Inc. | Oct 23, 2006 | Oct 30, 2006 | Nov 29, 2006 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69625 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,909 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| SpraberryUPPER SPRABERRY | 5,910 | -3,001 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,192 | 6,208 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 403 | 17.5 | — |
| 8.625 | 3,503 | 11 | — |
| 5.5 | 6,396 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 4, 2011 | Feb 8, 2011 | — |
| 00 | Feb 8, 2011 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-305-30465 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-305-30465 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Aug 2013
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102538 | W-14 Disposal | Not activated | 1,500 | 1,865 | 3,930–4,150 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30530465, documented in the API reference.