WELL · 42-307-30545 · DISTRICT 7
Taylor #1A
McCulloch County · Wallope Creek NE. field · Vertical
Taylor #1A (API 42-307-30545) is a plugged well in Mcculloch County, plugged September 16, 2003, last operated by J & J Services Company.
The RRC has issued one drilling permit, issued June 11, 1980, permitted to 1,800 ft.
It was permitted by Blair Exploration, Inc. and has since transferred to J & J Services Company on the wellbore schedule.
Operator of record
Permitted by Blair Exploration, Inc.; the EWA schedule now lists a different operator.
San Angelo, TX · P-5 Y, filed Jul 4, 2026 · 13 permits on file · (325) 656-5770
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J & J Services Company |
| Production reports | none |
| Latest permit | Blair Exploration, Inc.Jun 11, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,800
- total depth, ft
- 1
- permits on file
- Jun 11, 1980
- last permit issued
- May 13, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 13, 1981
- Shut in
- —
- Plugged
- Sep 16, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Taylor G-9-94196 | Wallope Creek , NE. | J & J Services Company | 1 | 0 | 0 | Jan 1993 – Sep 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 83617-99 | Drill | Blair Exploration, Inc. | Jun 11, 1980 | Jun 11, 1980 | Aug 19, 1980 | 1,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-94196 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,690 | 1,692 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 161 | 11 | 125 S |
| 4.5 | 1,730 | 7.875 | 200 S |
| 2.375 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jun 19, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-307-30545 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-307-30545 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30730545, documented in the API reference.