WELL · 42-311-31449 · DISTRICT 1

Matula Robert #1A

N

McMullen County · Debby (Mirando UP) field  · Vertical

Matula Robert #1A (API 42-311-31449) is a well in Mcmullen County operated by Texas Secondary Oil Corporation, completed May 13, 1980.

The RRC has issued 2 drilling permits between 1980 and 1993, permitted to 1,000 ft.

It was permitted by Harmony Drilling Company, Inc. and has since transferred to Texas Secondary Oil Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Whitsett, Hockley, Govt Wells.

Its 2 leases have reported 4.6K barrels of oil and 11.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Texas Secondary Oil Corporation

Permitted by Harmony Drilling Company, Inc.; the EWA schedule now lists a different operator.

Devine, TX · P-5 Y, filed Aug 4, 2025 · 304 permits on file · (830) 538-4004

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas Secondary Oil Corporation
Production reportsTexas Secondary Oil Corporationthrough Nov 2017
Latest permitHarmony Drilling Company, Inc.Oct 18, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
2
permits on file
Oct 18, 1993
last permit issued
May 13, 1980
completed
4.6K
cumulative oil, bbl
11.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 13, 1980
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Matula, Robert G-1-147066Debby (Gov't Wells)Texas Secondary Oil Corporation1011.4KOct 1993 – Jul 2026
Matula, Robert O-1-6365Debby (Mirando UP)Texas Secondary Oil Corporation24.6K21Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tanos Production, Inc.Jan 1993 → Nov 1994
  2. 2Harmony Drilling Company, Inc.Oct 1993 → Nov 1994
  3. 3Texas Secondary Oil CorporationDec 1994 → Nov 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
416929-99RecompletionHarmony Drilling Company, Inc.Oct 11, 1993Oct 18, 1993Oct 4, 1993980
78902-99DrillMesquite Land & Minerals, Inc.Apr 22, 1980Apr 22, 1980—1,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-147066————
—— O-1-6365————

Formation tops

As filed on W-2/G-1. Subsea from 265 ft elevation.Download CSV →

FormationMD ftSubsea
Whitsett1264
Hockley642-377
Govt Wells900-635

Perforations

Perforated and open-hole intervals.

FromToType
944949Perforated
1,0981,100Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,1346.125106 S
4.51,134——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 20, 1993Oct 25, 1993Yes
00Nov 9, 1993——
00Jan 12, 1984Jun 30, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31131449, documented in the API reference.