WELL · 42-311-31508 · DISTRICT 1
Wheeler Clifton #3
McMullen County · San Miguel Creek E. (6050) field · Vertical
Wheeler Clifton #3 (API 42-311-31508) is a plugged well in Mcmullen County, plugged December 31, 1996, last operated by Hamilton-Tedford Oper. CO. LLC.
The RRC has issued one drilling permit, issued September 19, 1980, permitted to 6,200 ft.
It was permitted by Hamilton, John M. and has since transferred to Hamilton-Tedford Oper. CO. LLC on the wellbore schedule.
Its lease has reported 5.09K barrels of oil and 21 mcf of gas since January 1993, last reporting in May 2007. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Hamilton-Tedford Oper. Co. LLC
Permitted by Hamilton, John M.; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Feb 2, 2007
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hamilton-Tedford Oper. Co. LLC |
| Production reports | Hamilton-Tedford Oper. Co., LLCthrough Jun 2004 |
| Latest permit | Hamilton, John M.Sep 19, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,200
- total depth, ft
- 1
- permits on file
- Sep 19, 1980
- last permit issued
- Nov 30, 1980
- completed
- 5.09K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 30, 1980
- Shut in
- —
- Plugged
- Dec 31, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wheeler, Clifton O-1-4290 | San Miguel Creek, E. (6050) | Hamilton-Tedford Oper. Co., LLC | 2 | 5.09K | 21 | Jan 1993 – May 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hamilton, John M.Jan 1993 → May 2001
- 2Hamilton, John M. EstateJun 2001 → Mar 2003
- 3Hamilton, Dorothy G.Apr 2003 → Sep 2003
- 4Hamilton-Tedford Oper. Co., LLCOct 2003 → Jun 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 93375-99 | Drill | Hamilton, John M. | Sep 19, 1980 | Sep 19, 1980 | — | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-4290 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,810 | 5,818 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 186 | 12.25 | 130 S |
| 2.375 | 5,740 | — | — |
| 4.5 | 6,150 | 7.875 | 1,800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jan 5, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-31508 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-31508 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31131508, documented in the API reference.