WELL · 42-311-32277 · DISTRICT 1

Henry South Edna Gibbons #9

Plugged

McMullen County · A.W.P. (Wilcox 6200) field  · Vertical

Henry South Edna Gibbons #9 (API 42-311-32277) is a plugged well in Mcmullen County, plugged April 9, 2020, last operated by Trek Resources Inc..

The RRC has issued 2 drilling permits between 1985 and 2012, permitted to 9,900 ft.

Completion filings report 3 formation tops, including Queen City, Wilcox, Olmos.

Its 2 leases have reported 493K barrels of oil and 2.51M mcf of gas since January 1993, last reporting in July 2026. The leases carry 15 wells, so these are lease totals, not this well alone.

Operator of record

Trek Resources Inc.

Dallas, TX · P-5 Y, filed Apr 4, 2026 · 77 permits on file · (214) 679-3510

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrek Resources Inc.
Production reportsWR Resources, LLCthrough Apr 2026
Latest permitTrek Resources, Inc.Jul 23, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,900
total depth, ft
2
permits on file
Jul 23, 2012
last permit issued
Mar 8, 2005
completed
493K
cumulative oil, bbl
2.51M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 8, 2005
Shut in
—
Plugged
Apr 9, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henry South, Edna Gibbons O-1-8926A.W.P. (Olmos)WR Resources, LLC14493K2.51MJan 1993 – Jul 2026
Henry South, Edna Gibbons O-1-17374A.W.P. (Wilcox 6200)Trek Resources, Inc.100Feb 2012 – Jul 2020

Oil, barrels lease total

Last 12 months 1,055 · prior 12 1,153(-8%)

0200400202420252026

Gas, mcf lease total

Last 12 months 1,532 · prior 12 8,434(-82%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dolch Production, Inc.Jan 1993 → Jul 1996
  2. 2H-M Resource Management, Inc.Aug 1996 → Jun 2009
  3. 3Trek Resources, Inc.Jul 2009 → Sep 2024
  4. 4WR Resources, LLCOct 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
742784-99RecompletionTrek Resources, Inc.Jun 13, 2012Jul 23, 2012Feb 25, 20057,000
271255-99DrillDolch Production, Inc.Apr 2, 1985Apr 2, 1985Apr 8, 19859,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-8926————
—— O-1-17374————

Formation tops

As filed on W-2/G-1. Subsea from 261 ft elevation.Download CSV →

FormationMD ftSubsea
Queen CityQUEEN CITY SAND2,710-2,449
WilcoxWILCOX SAND4,270-4,009
OlmosOLMOS SAND9,370-9,109

Perforations

Perforated and open-hole intervals.

FromToType
6,7506,755Perforated
9,3709,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,51012.5450 S
5.59,5608.753,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2014Jul 31, 2012—
00Mar 23, 2011Mar 15, 2011—
00Jul 3, 1985Jun 20, 1985—
00Jun 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31132277, documented in the API reference.