WELL · 42-311-32610 · DISTRICT 1

Matocha #6

Y

McMullen County · A.W.P. (Wales) field · Shut IN  · Vertical

Matocha #6 (API 42-311-32610) is a well in Mcmullen County operated by Dorado Drilling Inc., completed June 16, 2000 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued November 23, 1987, permitted to 6,500 ft.

It was permitted by Tana Oil & Gas Corp. and has since transferred to Dorado Drilling Inc. on the wellbore schedule.

Its lease has reported 12.3K barrels of oil and 54.4K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Dorado Drilling Inc.

Permitted by Tana Oil & Gas Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Dec 4, 2025 · (662) 590-2440

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDorado Drilling Inc.
Production reportsDorado Drilling, Inc.through Mar 2023
Latest permitTana Oil & Gas Corp.Nov 23, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Nov 23, 1987
last permit issued
Jun 16, 2000
completed
12.3K
cumulative oil, bbl
54.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 16, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Matocha O-1-12003A.W.P. (Wales)Dorado Drilling, Inc.112.3K54.4KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMay 1995 → Feb 1996
  3. 3Tri-Union Development Corp.Jun 2000 → Oct 2004
  4. 4Texcal Energy (GP) LLCNov 2004 → May 2010
  5. 5Milagro Exploration, LLCJun 2010 → Oct 2015
  6. 6White Oak Operating Company LLCNov 2015 → Aug 2020
  7. 7Dorado Drilling, Inc.Sep 2020 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
339280-99DrillTana Oil & Gas Corp.Nov 23, 1987Nov 23, 1987—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12003————

Perforations

Perforated and open-hole intervals.

FromToType
6,1226,130Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62568212.25315 S
4.56,2767.8751,235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 4, 2000Aug 10, 2000—
00May 11, 1988Mar 9, 1988Yes
00Apr 26, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31132610, documented in the API reference.