WELL · 42-311-32621 · DISTRICT 1
Teal #1R
McMullen County · Teal S. (Wales) field · Vertical
Teal #1R (API 42-311-32621) is a plugged well in Mcmullen County, plugged April 19, 2018, last operated by White Oak Operating Company LLC.
The RRC has issued one drilling permit, issued January 7, 1988, permitted to 6,600 ft.
It was permitted by Tana Oil & Gas Corp. and has since transferred to White Oak Operating Company LLC on the wellbore schedule.
Its lease has reported 25.9K barrels of oil and 11K mcf of gas since January 1993, last reporting in June 2019.
Operator of record
White Oak Operating Company LLC
Permitted by Tana Oil & Gas Corp.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jan 5, 2026 · 101 permits on file · (800) 515-8538
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | White Oak Operating Company LLC |
| Production reports | White Oak Operating Company LLCthrough Jan 2016 |
| Latest permit | Tana Oil & Gas Corp.Jan 7, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,600
- total depth, ft
- 1
- permits on file
- Jan 7, 1988
- last permit issued
- Mar 10, 1988
- completed
- 25.9K
- cumulative oil, bbl
- 11K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 10, 1988
- Shut in
- —
- Plugged
- Apr 19, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Teal O-1-12005 | Teal S. (Wales) | White Oak Operating Company LLC | 1 | 25.9K | 11K | Jan 1993 – Jun 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Dec 1994
- 2Apache CorporationNov 1995 → Apr 1996
- 3Tri-Union Development Corp.Apr 2000 → Jun 2002
- 4Texcal Energy (GP) LLCDec 2004 → May 2010
- 5Milagro Exploration, LLCJun 2010 → May 2015
- 6White Oak Operating Company LLCDec 2015 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 341081-99 | Drill | Tana Oil & Gas Corp. | Jan 6, 1988 | Jan 7, 1988 | — | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12005 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,098 | 6,110 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 683 | 12.25 | 315 S |
| 4.5 | 6,271 | 7.875 | 1,220 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 28, 1988 | Mar 12, 1988 | Yes |
| 00 | Apr 23, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-32621 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-32621 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31132621, documented in the API reference.