WELL · 42-311-32860 · DISTRICT 1
Dilworth J. C. #1
McMullen County · Dilworth (Wilcox 5500) field · Vertical
Dilworth J. C. #1 (API 42-311-32860) is a plugged well in Mcmullen County, plugged August 14, 1995, last operated by Hawn Brothers Company.
The RRC has issued 2 drilling permits between 1990 and 1993, permitted to 6,010 ft.
Completion filings report 2 formation tops, including Carrizo, Wilcox.
Its 2 leases have reported 451 barrels of oil and 59.9K mcf of gas since January 1993, last reporting in August 1995. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Corpus Christ, TX · P-5 Y, filed Nov 8, 2002 · 52 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hawn Brothers Company |
| Production reports | Hawn Brothers Companythrough Jan 1995 |
| Latest permit | Hawn Brothers CompanyApr 26, 1993 |
- 6,010
- total depth, ft
- 2
- permits on file
- Apr 26, 1993
- last permit issued
- Jan 9, 1991
- completed
- 451
- cumulative oil, bbl
- 59.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 9, 1991
- Shut in
- —
- Plugged
- Aug 14, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dilworth, J.C. G-1-145104 | Dilworth (Wales a Sand) | Hawn Brothers Company | 1 | 0 | 59.9K | Apr 1993 – Aug 1995 |
| Dilworth, J. C. O-1-12810 | Dilworth (Wilcox 5500) | Hawn Brothers Company | 1 | 451 | 30 | Jan 1993 – Jun 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hawn Brothers CompanyJan 1993 → Jan 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 410766-99 | Recompletion | Hawn Brothers Company | Apr 15, 1993 | Apr 26, 1993 | Apr 6, 1993 | 6,010 |
| 380210-99 | Drill | Hawn Brothers Company | Oct 26, 1990 | Oct 31, 1990 | Dec 16, 1990 | 6,010 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-145104 | — | — | — | — |
| — | — O-1-12810 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 267 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,407 | 5,419 | Perforated |
| 5,440 | 5,444 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 600 | 12.25 | 215 S |
| 4.5 | 5,907 | 7.875 | 918 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 6, 1993 | May 11, 1993 | Yes |
| 00 | May 13, 1993 | — | — |
| 00 | Jan 30, 1991 | Jan 15, 1991 | Yes |
| 00 | Jan 17, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-32860 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-32860 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31132860, documented in the API reference.