WELL · 42-311-33544 · DISTRICT 1
Cousins #2
McMullen County · Cousins (Slick-Wilcox) field · Temp Abandoned · Vertical
Cousins #2 (API 42-311-33544) is a well in Mcmullen County operated by Ross Gas And Oil Ltd. CO., completed May 10, 1999 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued March 29, 1999, permitted to 8,000 ft.
It was permitted by Rexcom, Inc. and has since transferred to Ross Gas And Oil Ltd. CO. on the wellbore schedule.
Completion filings report 3 formation tops, including Yegua, Queen City, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Rexcom, Inc.; the EWA schedule now lists a different operator.
Dripping Spgs, TX · P-5 Y, filed Sep 4, 2025 · (512) 732-0991
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ross Gas and Oil Ltd. Co. |
| Production reports | Ross Gas and Oil, Ltd. Co.through Jan 2008 |
| Latest permit | Rexcom, Inc.Mar 29, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 1
- permits on file
- Mar 29, 1999
- last permit issued
- May 10, 1999
- completed
- 0
- cumulative oil, bbl
- 350K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 10, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cousins G-1-173405 | Cousins (Slick-Wilcox) | Ross Gas and Oil, Ltd. Co. | 1 | 0 | 350K | May 1999 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rexcom, Inc.May 1999 → Jul 1999
- 2Maverick Energy & Dev. Corp.Aug 1999 → Apr 2001
- 3Pace Oil and Gas CompanyJan 2003 → Oct 2003
- 4Adt Investments, Inc.Nov 2003 → Nov 2003
- 5Ross Gas and Oil, Ltd. Co.Jan 2004 → Jan 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483554-99 | Drill | Rexcom, Inc. | Mar 29, 1999 | Mar 29, 1999 | Apr 13, 1999 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-173405 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 497 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 2,969 | -2,472 |
| Queen City | 5,660 | -5,163 |
| Wilcox | 7,286 | -6,789 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,286 | 7,296 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 850 | 12.25 | 385 S |
| 5.5 | 7,996 | 7.875 | 395 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 1999 | Jun 14, 1999 | Yes |
| 00 | Jul 9, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-33544 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-33544 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31133544, documented in the API reference.