WELL · 42-311-33726 · DISTRICT 1
SBR #208
McMullen County · A.W.P. (Olmos) field · Temp Abandoned · Vertical
Sbr #208 (API 42-311-33726) is a well in Mcmullen County operated by Varas Energy Operating Company, completed February 27, 2004 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued January 13, 2004, permitted to 12,000 ft.
It was permitted by Swift Energy Company and has since transferred to Varas Energy Operating Company on the wellbore schedule.
Completion filings report 6 formation tops, including Sparta, Queen City, Carrizo, Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Varas Energy Operating Company
Permitted by Swift Energy Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Oct 4, 2025 · (713) 301-7468
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Varas Energy Operating Company |
| Production reports | EL Dorado Gas & Oil, Inc.through May 2020 |
| Latest permit | Swift Energy CompanyJan 13, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- Jan 13, 2004
- last permit issued
- Feb 27, 2004
- completed
- 0
- cumulative oil, bbl
- 142K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 27, 2004
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| SBR G-1-200229 | A.W.P. (Olmos) | Varas Energy Operating Company, | 1 | 0 | 142K | Feb 2004 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Swift Energy CompanyFeb 2004 → Dec 2005
- 2Swift Energy Operating, LLCJan 2006 → Jun 2017
- 3Silverbow Resources Oper, LLCAug 2017 → Dec 2017
- 4EL Dorado Gas & Oil, Inc.Jan 2018 → May 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540706-99 | Drill | Swift Energy Company | Jan 13, 2004 | Jan 13, 2004 | Jan 20, 2004 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-200229 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,501 | 10,511 | Perforated |
| 10,518 | 10,526 | Perforated |
| 10,531 | 10,541 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,520 | 10.75 | 360 S |
| 3.5 | 10,800 | 7.875 | 4,035 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 27, 2004 | Mar 24, 2004 | Yes |
| 00 | Apr 6, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-33726 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-33726 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31133726, documented in the API reference.